BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Weekly price updates

Key prices are re-checked every Monday against dated market sources. Each weekly change is listed here, newest first. Follow the update feed to be notified.

2026-10-15
Weekly refresh: naira steady at N1,333/$ (CBN NFEM, 14 Oct; week's closes N1,331.50-1,333.55; imported items unchanged); petrol Abuja N1,385 -> N1,405/L (NNPC N1,405, MRS and AA Rano N1,409-1,410 after the 10-11 Oct rise); LPG reconfirmed at N1,100/kg (depots N980-1,170). Diesel left at N1,870/L: Dangote gantry rose N1,700 -> N1,800 on 10 Oct but no dated Abuja pump price was found. Cement, rebar, roofing, 9-inch block, sand and granite unchanged (no fresh dated Abuja source). No LOW lines upgraded.
2026-10-06
Plant hire re-priced on purchase-price evidence (about 1%/day of replacement value) checked against Nigerian oilfield hire bands: Generator 20kVA (diesel) N35,000 -> N55,000/day; Generator 60kVA (diesel) N70,000 -> N95,000/day; Generator 100kVA (diesel) N110,000 -> N130,000/day; Generator 250kVA (diesel) N220,000 -> N240,000/day; Generator 500kVA N400,000 -> N600,000/day; Welding generator 400A (diesel) N45,000 -> N80,000/day; Air compressor 375cfm with 2 breakers N120,000 -> N260,000/day; Air compressor 750cfm N250,000 -> N500,000/day; Air compressor 900cfm (diesel) with hoses and accessories N300,000 -> N600,000/day; Mobile crane 100t N2,000,000 -> N2,500,000/day. The 25% single-source limit was waived for this change at Kola's request.
2026-10-06
Added oil & gas support equipment lines (LOW, judgement, verify with quotes): 900cfm air compressor N300,000/day; 100t mobile crane N2,000,000/day; TIG welding set N18,000/day; electric welding set N12,000/day; 6-inch diesel flushing pump N80,000/day; three scaffold hire kits (tubes 4m, tubes 3m+2m with couplers, boards and fittings) and a scaffolder/rigger tool kit. 400cfm compressor, 100 and 250kVA generators and diesel welding generator were already listed.
2026-10-06
Restored from artifact: the 5 Oct and 6 Oct refreshes (naira, diesel, petrol, LPG, Dangote and BUA cement, 9-inch block, four aluminium roofing lines, 2.5mm2 cable), which had been published but not saved to the repo. Follow-up check found no new dated Abuja evidence for the cement average, rebar, sharp sand or granite, and no dated source to upgrade LOW plumbing or long-reach excavator lines; no further price changes.
2026-10-06
Weekly refresh: naira N1,328 -> N1,333/$ (CBN NFEM, 6 Oct; imported items follow); diesel N1,900 -> N1,870/L (Dangote gantry cut N1,850 -> N1,780, national pump avg N1,811); petrol Abuja N1,400 -> N1,385/L (NNPC N1,370, independents N1,400); 2.5mm2 cable 100m coil N85,000 -> N77,000 (Coleman retailer list, LOW -> MEDIUM); LPG N1,100/kg, 9-inch block N850 and aluminium roofing reconfirmed. Cement average, rebar, sand and granite unchanged (no fresh Abuja source). Also saves the 5 Oct refresh (Dangote/BUA cement), which had been published but not saved to the repo.
2026-10-05
Weekly refresh: naira N1,331 -> N1,328/$ (CBN NFEM, 2 Oct; imported items follow); petrol N1,360 -> N1,400/L (Abuja pumps N1,370-1,450); Dangote cement N12,300 -> N12,500/bag and BUA N11,800 -> N12,200/bag (Abuja dealer checks, 21 Sep); 0.40mm roofing confirmed at N5,600/m2. Cement average, rebar, diesel, LPG, blocks, sand and granite unchanged (no new Abuja-dated evidence).
2026-10-01
Added 207 construction equipment purchase prices (new and used): excavators, loaders, dozers, graders, rollers, pavers, asphalt and batching plants, tippers, low-beds, cranes, forklifts, concrete pumps, block machines, crushers, drill rigs, compressors, generators, pumps, dredgers, vessels, piling rigs and survey instruments.
2026-10-01
v3: added 457 materials, tools and test services, 47 labour grades, 46 plant items and 170 composite rates covering oil & gas pipelines, piling, bridges, ports and reclamation, railways, power, water and sewerage, fire, HVAC, lifts, ICT and industrial buildings. Imported items now track the naira-dollar rate.
2026-09-29
v2 published: 372 materials, 51 labour grades, 78 plant items, 160 build-ups. Base prices researched 29 Sep 2026.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/updates/, prices as at 15 October 2026.