| Code | Description | Unit | Materials | Labour | Plant | Net rate | |
|---|---|---|---|---|---|---|---|
| A Earthworks | |||||||
| A01 | Clear site of bush and shrubs, remove arisings | m2 | ₦0 | ₦172 | ₦0 | ₦172 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| A02 | Excavate trench for strip foundation by hand, n.e. 1.5m deep, normal soil | m3 | ₦0 | ₦4,585 | ₦0 | ₦4,585 | |
| A03 | Bulk excavation by machine n.e. 2m deep, deposit in spoil heap on site | m3 | ₦0 | ₦115 | ₦2,449 | ₦2,564 | |
| A04 | Backfill with selected excavated material, compacted in 150mm layers | m3 | ₦0 | ₦2,292 | ₦594 | ₦2,886 | |
| A05 | Imported laterite filling, compacted in 150mm layers | m3 | ₦9,896 | ₦1,719 | ₦678 | ₦12,294 | |
| A06 | Hardcore bed 150mm thick, blinded with stone dust, compacted | m2 | ₦3,308 | ₦573 | ₦237 | ₦4,118 | |
| A07 | Anti-termite treatment to formation | m2 | ₦683 | ₦34.39 | ₦0 | ₦717 | |
| A08 | 1000g polythene DPM with 150mm laps | m2 | ₦333 | ₦57.31 | ₦0 | ₦390 | |
| A09 | Excavate trench by backhoe, n.e. 1.5m deep, trim by hand | m3 | ₦0 | ₦344 | ₦4,802 | ₦5,146 | |
| A10 | Excavate in rock using excavator-mounted breaker | m3 | ₦0 | ₦1,146 | ₦39,036 | ₦40,182 | |
| A11 | Keep excavations free of water - 3" pump incl. attendance | day | ₦0 | ₦2,292 | ₦23,660 | ₦25,952 | |
| A12 | Level and compact bottom of excavation / formation | m2 | ₦0 | ₦115 | ₦79.14 | ₦194 | |
| A13 | Imported sand filling, compacted in 150mm layers | m3 | ₦7,332 | ₦1,376 | ₦678 | ₦9,386 | |
| A14 | Clear site by bulldozer incl. grubbing roots | m2 | ₦0 | ₦11.46 | ₦82.77 | ₦94.24 | |
| A15 | Load and cart away surplus spoil to tip n.e. 10km | m3 | ₦0 | ₦57.31 | ₦8,361 | ₦8,418 | |
| B Concrete | |||||||
| B01 | Plain concrete 1:3:6 in blinding (site-mixed) | m3 | ₦94,469 | ₦9,334 | ₦2,833 | ₦106,635 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| B02 | Reinforced concrete 1:2:4 in foundations / bases / ground beams | m3 | ₦119,464 | ₦12,854 | ₦5,148 | ₦137,466 | |
| B03 | Reinforced concrete 1:2:4 in suspended slabs, beams & columns | m3 | ₦119,464 | ₦19,896 | ₦6,178 | ₦145,537 | |
| B04 | Reinforced concrete 1:1.5:3 (~C25) in suspended slabs & beams | m3 | ₦140,773 | ₦19,896 | ₦6,178 | ₦166,847 | |
| B05 | Ready-mix C25/30 placed by pump in suspended slab | m3 | ₦175,900 | ₦4,831 | ₦482 | ₦181,213 | |
| B06 | High-yield reinforcement 12-16mm, cut, bent & fixed | t | ₦1,123,920 | ₦81,875 | ₦0 | ₦1,205,795 | |
| B07 | Formwork (plank) to sides of foundations & ground beams | m2 | ₦2,811 | ₦3,701 | ₦0 | ₦6,511 | |
| B08 | Formwork (marine board) to soffit of suspended slab incl. propping n.e. 3.5m | m2 | ₦5,030 | ₦5,551 | ₦0 | ₦10,581 | |
| B09 | Formwork (marine board) to columns and beams | m2 | ₦4,908 | ₦5,600 | ₦0 | ₦10,508 | |
| B10 | BRC mesh A142 in ground slab incl. laps | m2 | ₦4,933 | ₦180 | ₦0 | ₦5,113 | |
| B11 | High-yield reinforcement 20-25mm, cut, bent & fixed | t | ₦1,137,780 | ₦62,552 | ₦0 | ₦1,200,332 | |
| B12 | Reinforcement 8-10mm links/stirrups, cut, bent & fixed | t | ₦1,187,130 | ₦115,935 | ₦0 | ₦1,303,065 | |
| B13 | Formwork (marine board) to walls | m2 | ₦5,045 | ₦5,044 | ₦0 | ₦10,089 | |
| B14 | Formwork to staircase soffits, strings & risers | m2 | ₦7,244 | ₦8,679 | ₦0 | ₦15,923 | |
| B15 | Ready-mix C30/37 placed by pump in columns & walls | m3 | ₦191,060 | ₦6,386 | ₦643 | ₦198,089 | |
| B16 | Power-floated finish to concrete slab | m2 | ₦0 | ₦247 | ₦127 | ₦374 | |
| B17 | Precast lintel 150x225x1500, supply and bed in mortar | nr | ₦18,628 | ₦1,081 | ₦0 | ₦19,709 | |
| B18 | Ready-mix C35/45 placed by boom pump in raft/transfer slab | m3 | ₦195,840 | ₦3,766 | ₦5,125 | ₦204,732 | |
| B19 | Formwork to slab using steel props (props hired) | m2 | ₦3,601 | ₦4,487 | ₦2,100 | ₦10,187 | |
| B20 | Rib-and-block (hollow pot) suspended slab 225mm incl. topping & rib rebar (excl. propping) | m2 | ₦35,583 | ₦3,562 | ₦361 | ₦39,505 | |
| C Masonry | |||||||
| C01 | 225mm hollow sandcrete blockwork in cement-sand mortar 1:6 | m2 | ₦11,391 | ₦1,670 | ₦0 | ₦13,061 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| C02 | 150mm hollow sandcrete blockwork in cement-sand mortar 1:6 | m2 | ₦9,549 | ₦1,433 | ₦0 | ₦10,982 | |
| C03 | 225mm hollow blockwork filled solid with 1:2:4 concrete, below DPC | m2 | ₦18,552 | ₦2,849 | ₦0 | ₦21,402 | |
| C04 | CROSS-CHECK: produce 9" hollow sandcrete block on site (machine), cured | nr | ₦674 | ₦86.46 | ₦62.21 | ₦823 | |
| C05 | 125mm hollow blockwork partition in mortar 1:6 | m2 | ₦7,424 | ₦1,253 | ₦0 | ₦8,676 | |
| C06 | Half-brick burnt clay facing brickwork in mortar 1:4, pointed | m2 | ₦31,149 | ₦4,094 | ₦0 | ₦35,243 | |
| C07 | 225mm solid block walling in mortar 1:6 | m2 | ₦13,456 | ₦1,850 | ₦0 | ₦15,307 | |
| C08 | Bituminous felt DPC 225mm wide bedded on walls | m | ₦827 | ₦123 | ₦0 | ₦950 | |
| D Roofing | |||||||
| D01 | Timber roof: 2x4 trusses/rafters, 2x3 purlins, 2x6 wall plate, treated (slope area) | m2 | ₦4,489 | ₦2,686 | ₦0 | ₦7,175 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| D02 | 0.55mm longspan aluminium (Grade A) on timber purlins incl. laps, ridges & fixings | m2 | ₦8,919 | ₦1,015 | ₦0 | ₦9,934 | |
| D03 | Stone-coated steel tiles on 2x2 battens incl. fixings | m2 | ₦14,186 | ₦1,523 | ₦0 | ₦15,709 | |
| D04 | PVC fascia board fixed to rafter ends | m | ₦6,064 | ₦696 | ₦0 | ₦6,760 | |
| D05 | 0.55mm longspan aluminium, caliper grade, on purlins | m2 | ₦15,527 | ₦1,015 | ₦0 | ₦16,542 | |
| D06 | 0.45mm longspan aluminium (market) on purlins | m2 | ₦6,791 | ₦1,015 | ₦0 | ₦7,806 | |
| D07 | Step-tile/Metcopo aluminium 0.55mm on purlins | m2 | ₦10,863 | ₦1,146 | ₦0 | ₦12,009 | |
| D08 | 0.55mm caliper longspan on steel purlins with self-drilling screws | m2 | ₦15,897 | ₦1,015 | ₦0 | ₦16,912 | |
| D09 | Aluminium gutter with brackets | m | ₦8,269 | ₦901 | ₦0 | ₦9,169 | |
| D10 | 110mm uPVC rainwater downpipe with clips | m | ₦2,661 | ₦590 | ₦0 | ₦3,251 | |
| D11 | Reflective foil insulation laid over purlins | m2 | ₦2,178 | ₦131 | ₦0 | ₦2,309 | |
| D12 | PVC soffit/eaves panels on 2x2 framing | m2 | ₦8,449 | ₦1,621 | ₦0 | ₦10,070 | |
| D13 | Stone-coated ridge/hip capping | m | ₦13,596 | ₦655 | ₦0 | ₦14,251 | |
| E Finishes | |||||||
| E01 | 15mm internal plaster, cement-sand 1:6, to blockwork | m2 | ₦1,598 | ₦1,785 | ₦0 | ₦3,383 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| E02 | 20mm external render, cement-sand 1:4 | m2 | ₦2,764 | ₦2,231 | ₦0 | ₦4,995 | |
| E03 | 40mm cement-sand 1:3 floor screed | m2 | ₦5,529 | ₦1,318 | ₦0 | ₦6,847 | |
| E04 | 600x600 ceramic floor tiles (mid-range) on adhesive, grouted | m2 | ₦11,061 | ₦2,006 | ₦0 | ₦13,067 | |
| E05 | 600x600 polished porcelain floor tiles (premium) on adhesive, grouted | m2 | ₦28,995 | ₦2,374 | ₦0 | ₦31,369 | |
| E06 | 300x600 wall tiles on adhesive, grouted | m2 | ₦8,120 | ₦2,497 | ₦0 | ₦10,617 | |
| E07 | Skim coat + 3 coats emulsion to internal plastered walls | m2 | ₦2,441 | ₦774 | ₦0 | ₦3,215 | |
| E08 | 2 coats weathershield paint to external render | m2 | ₦998 | ₦614 | ₦0 | ₦1,612 | |
| E09 | 12.5mm gypsum board ceiling on 2x2 frame, POP-jointed | m2 | ₦7,408 | ₦1,531 | ₦0 | ₦8,939 | |
| E10 | 600x600 matt anti-slip porcelain floor tiles on adhesive | m2 | ₦17,655 | ₦2,252 | ₦0 | ₦19,907 | |
| E11 | 400x400 ceramic floor tiles on adhesive | m2 | ₦7,904 | ₦1,883 | ₦0 | ₦9,787 | |
| E12 | 20mm local polished granite flooring on mortar bed | m2 | ₦55,439 | ₦4,863 | ₦0 | ₦60,303 | |
| E13 | 20mm imported marble flooring on mortar bed | m2 | ₦99,439 | ₦5,420 | ₦0 | ₦104,859 | |
| E14 | SPC vinyl click flooring on underlay | m2 | ₦16,200 | ₦737 | ₦0 | ₦16,937 | |
| E15 | 100mm tile skirting on adhesive | m | ₦2,230 | ₦368 | ₦0 | ₦2,599 | |
| E16 | Sealer + skim + 3 coats silk emulsion to internal walls | m2 | ₦3,126 | ₦876 | ₦0 | ₦4,002 | |
| E17 | Knot, prime & 3 coats gloss to wood or metal | m2 | ₦2,751 | ₦921 | ₦0 | ₦3,672 | |
| E18 | Sand-textured coating + 2 coats weathershield, external | m2 | ₦3,832 | ₦1,240 | ₦0 | ₦5,073 | |
| E19 | POP screeding (skimming) to walls/ceilings | m2 | ₦1,134 | ₦827 | ₦0 | ₦1,961 | |
| E20 | Plain POP false ceiling on 2x2 timber frame | m2 | ₦5,331 | ₦2,595 | ₦0 | ₦7,926 | |
| E21 | PVC ceiling panels on 2x2 frame | m2 | ₦7,205 | ₦1,003 | ₦0 | ₦8,208 | |
| E22 | 600x600 acoustic ceiling tiles on exposed T-grid | m2 | ₦13,125 | ₦1,003 | ₦0 | ₦14,128 | |
| E23 | POP cornice | m | ₦2,889 | ₦475 | ₦0 | ₦3,364 | |
| E24 | Natural stone wall cladding on adhesive | m2 | ₦24,480 | ₦2,800 | ₦0 | ₦27,280 | |
| E25 | 2-coat epoxy floor coating | m2 | ₦5,985 | ₦614 | ₦0 | ₦6,599 | |
| E26 | 8mm laminate flooring on underlay | m2 | ₦9,720 | ₦835 | ₦0 | ₦10,555 | |
| E27 | Carpet tiles on adhesive | m2 | ₦14,700 | ₦614 | ₦0 | ₦15,314 | |
| E28 | Gypsum drywall partition, 12.5mm board both sides on metal studs | m2 | ₦15,340 | ₦2,243 | ₦0 | ₦17,584 | |
| E29 | Raised access floor 600x600 on adjustable pedestals | m2 | ₦113,526 | ₦1,212 | ₦0 | ₦114,738 | |
| E30 | Terrazzo floor 25mm laid, ground and polished | m2 | ₦19,452 | ₦4,831 | ₦1,000 | ₦25,283 | |
| E31 | HPL toilet cubicle partition installed | nr | ₦650,000 | ₦19,978 | ₦0 | ₦669,978 | |
| E32 | Roller blind supplied and fixed | m2 | ₦13,500 | ₦884 | ₦0 | ₦14,384 | |
| E33 | Hardwood parquet laid on adhesive, sanded and sealed | m2 | ₦31,995 | ₦3,128 | ₦500 | ₦35,623 | |
| E34 | HPL exterior cladding on steel sub-frame | m2 | ₦153,127 | ₦4,110 | ₦0 | ₦157,237 | |
| E35 | Aluminium louvre system installed | m2 | ₦75,000 | ₦3,406 | ₦0 | ₦78,406 | |
| E36 | Acoustic wall panels on timber battens | m2 | ₦33,345 | ₦2,227 | ₦0 | ₦35,572 | |
| E37 | Rubber gym flooring 15mm laid | m2 | ₦30,870 | ₦737 | ₦0 | ₦31,607 | |
| E38 | Homogeneous vinyl sheet flooring, coved and welded | m2 | ₦33,004 | ₦1,474 | ₦0 | ₦34,478 | |
| E39 | Aluminium-framed glass skylight installed and sealed | m2 | ₦164,725 | ₦8,351 | ₦0 | ₦173,076 | |
| F Electrical | |||||||
| F01 | Lighting point: 1.5mm2 in 20mm conduit (avg 8m), switch share, LED downlight | pt | ₦19,872 | ₦4,667 | ₦0 | ₦24,539 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| F02 | 13A socket point: 2.5mm2 in 20mm conduit (avg 10m), twin socket | pt | ₦28,120 | ₦5,649 | ₦0 | ₦33,769 | |
| F22 | AC/cooker point: 4mm2 in 25mm conduit (avg 12m), 15A outlet | pt | ₦46,424 | ₦7,287 | ₦0 | ₦53,711 | |
| F23 | 12-way TPN distribution board with 12 MCBs, installed | nr | ₦139,000 | ₦22,598 | ₦0 | ₦161,598 | |
| F24 | 100A 4-pole manual changeover switch, installed | nr | ₦105,000 | ₦14,574 | ₦0 | ₦119,574 | |
| F25 | 16mm2 4-core armoured sub-main cable laid in trench/on tray | m | ₦18,540 | ₦1,441 | ₦0 | ₦19,981 | |
| F26 | 25mm2 4-core armoured cable laid | m | ₦24,720 | ₦1,719 | ₦0 | ₦26,439 | |
| F27 | Earthing: copper-bonded rod, 10mm2 conductor, inspection pit | nr | ₦40,167 | ₦12,118 | ₦0 | ₦52,284 | |
| F28 | LED panel 600x600 fitting, supply & fix | nr | ₦18,000 | ₦1,638 | ₦0 | ₦19,638 | |
| F29 | 56" ceiling fan with regulator, supply & fix | nr | ₦45,000 | ₦4,912 | ₦0 | ₦49,912 | |
| F30 | Split AC 1.5HP inverter, supply & install (5m pipe run) | nr | ₦464,125 | ₦21,942 | ₦0 | ₦486,068 | |
| F31 | LED street light 100W on 8m pole with concrete base, installed | nr | ₦404,451 | ₦26,528 | ₦46,133 | ₦477,111 | |
| F32 | 5kVA hybrid solar system: 8x550W, 5kVA inverter, 10kWh LiFePO4, installed | nr | ₦3,988,000 | ₦75,980 | ₦0 | ₦4,063,980 | |
| F33 | Smoke detector, supply & fix | nr | ₦12,000 | ₦1,638 | ₦0 | ₦13,638 | |
| F Plumbing | |||||||
| F03 | WC suite (mid-range), supplied, fixed & connected | nr | ₦132,980 | ₦10,316 | ₦0 | ₦143,296 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| F04 | Wash hand basin with pedestal & mixer, fixed & connected | nr | ₦93,978 | ₦8,106 | ₦0 | ₦102,083 | |
| F05 | Single-bowl stainless kitchen sink with mixer, fixed & connected | nr | ₦79,975 | ₦8,106 | ₦0 | ₦88,081 | |
| F06 | WC suite (economy), supplied, fixed & connected | nr | ₦82,980 | ₦10,316 | ₦0 | ₦93,296 | |
| F07 | WC one-piece (premium), supplied, fixed & connected | nr | ₦357,980 | ₦11,790 | ₦0 | ₦369,770 | |
| F08 | Acrylic bathtub 1.7m with mixer, fixed & connected | nr | ₦286,038 | ₦17,685 | ₦0 | ₦303,722 | |
| F09 | Shower mixer set with head & floor drain, installed | nr | ₦64,990 | ₦10,316 | ₦0 | ₦75,306 | |
| F10 | Urinal with flush valve, fixed & connected | nr | ₦124,042 | ₦10,316 | ₦0 | ₦134,359 | |
| F11 | Electric water heater 50L, installed | nr | ₦185,775 | ₦10,644 | ₦0 | ₦196,419 | |
| F12 | Cold water point, 20mm PPR (avg 6m run) | pt | ₦12,384 | ₦3,979 | ₦0 | ₦16,363 | |
| F13 | Hot water point, 25mm PPR (avg 6m run) | pt | ₦15,240 | ₦4,569 | ₦0 | ₦19,809 | |
| F14 | Soil & waste point, uPVC 110/50mm | pt | ₦20,388 | ₦5,158 | ₦0 | ₦25,546 | |
| F15 | 2,000L tank on 6m steel stand, installed & connected | nr | ₦648,325 | ₦15,229 | ₦0 | ₦663,554 | |
| F16 | 1HP surface pump with valves, installed | nr | ₦119,000 | ₦12,118 | ₦0 | ₦131,118 | |
| F17 | Borehole drilling in basement rock, Abuja (subcontract) | m | ₦22,000 | ₦0 | ₦0 | ₦22,000 | |
| F18 | Complete borehole 120m: survey, drilling, casing, 1.5HP pump, tank stand & 2,000L tank | nr | ₦4,157,350 | ₦91,700 | ₦0 | ₦4,249,050 | |
| F19 | Inspection chamber 600x600x750 in 150mm block with cover | nr | ₦89,381 | ₦22,598 | ₦0 | ₦111,979 | |
| F20 | 110mm uPVC underground drain on sand bed (excl. trench) | m | ₦4,077 | ₦1,146 | ₦0 | ₦5,223 | |
| H Demolition | |||||||
| H01 | Demolish 225mm blockwork wall, stack debris on site | m2 | ₦0 | ₦1,376 | ₦0 | ₦1,376 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| H02 | Break up 150mm concrete slab with excavator breaker, load debris | m2 | ₦0 | ₦458 | ₦16,265 | ₦16,724 | |
| H03 | Break out reinforced concrete with compressor & breakers | m3 | ₦0 | ₦9,170 | ₦74,188 | ₦83,358 | |
| J Doors & windows | |||||||
| J01 | Flush door 900x2100 with frame & ironmongery, supply & fix | nr | ₦141,339 | ₦12,281 | ₦0 | ₦153,620 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| J02 | Hardwood panel door with frame, lock, handles & hinges, supply & fix | nr | ₦310,125 | ₦19,159 | ₦0 | ₦329,284 | |
| J03 | Steel security door 1200, supply & fix with grouting | nr | ₦494,503 | ₦9,661 | ₦0 | ₦504,164 | |
| J04 | Aluminium casement window, 5mm glass & net, s&f incl. making good | m2 | ₦95,268 | ₦737 | ₦0 | ₦96,005 | |
| J05 | Aluminium sliding window, s&f incl. making good | m2 | ₦80,268 | ₦737 | ₦0 | ₦81,005 | |
| J06 | uPVC casement window, s&f incl. making good | m2 | ₦150,268 | ₦737 | ₦0 | ₦151,005 | |
| J07 | Frameless 12mm tempered glass door, s&f | m2 | ₦180,000 | ₦344 | ₦0 | ₦180,344 | |
| J08 | Stick curtain wall, tinted glass, s&f | m2 | ₦260,000 | ₦229 | ₦0 | ₦260,229 | |
| J09 | Aluminium hinged door with glazing, s&f | m2 | ₦110,000 | ₦737 | ₦0 | ₦110,737 | |
| J10 | Fire-rated steel door 1hr with closer, supply & fix | nr | ₦954,017 | ₦9,661 | ₦0 | ₦963,678 | |
| J11 | Kitchen base cabinets with granite worktop, installed | m | ₦400,000 | ₦9,989 | ₦0 | ₦409,989 | |
| J12 | Kitchen wall cabinets, installed | m | ₦200,000 | ₦5,895 | ₦0 | ₦205,895 | |
| J13 | Built-in wardrobe, installed | m2 | ₦95,000 | ₦4,421 | ₦0 | ₦99,421 | |
| J14 | Steel sliding/swing gate, fabricated & installed | m2 | ₦86,339 | ₦1,801 | ₦0 | ₦88,140 | |
| K Marine & dredging | |||||||
| K01 | Dredge & hydraulically place sand fill by 12" CSD (in-situ m3) | m3 | ₦0 | ₦11.46 | ₦3,471 | ₦3,483 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| K02 | Hydraulic sand fill by 20" cutter suction dredger incl. discharge line, placed (in-situ m3) | m3 | ₦770 | ₦11.46 | ₦3,377 | ₦4,158 | |
| K03 | Hydraulic sand fill by trailing suction hopper dredger (rainbowing/pump-ashore), placed | m3 | ₦400 | ₦2.29 | ₦2,505 | ₦2,907 | |
| K04 | Spread and compact reclaimed sand in layers | m3 | ₦0 | ₦11.46 | ₦1,142 | ₦1,154 | |
| K05 | Armour rock 3-6t placed to revetment/breakwater profile | t | ₦39,140 | ₦188 | ₦7,271 | ₦46,599 | |
| K06 | Core rock 1-500kg placed and trimmed | t | ₦22,660 | ₦34.39 | ₦2,578 | ₦25,273 | |
| K07 | Underlayer rock 50-300kg placed | t | ₦26,780 | ₦45.85 | ₦2,508 | ₦29,334 | |
| K08 | Geotextile under revetment laid incl. underwater placement | m2 | ₦2,783 | ₦303 | ₦279 | ₦3,365 | |
| K09 | Concrete armour unit (2m3 class) cast in C35/45 and placed | m3 | ₦206,477 | ₦8,744 | ₦53,266 | ₦268,487 | |
| K10 | Cone fender SCN1000 with frontal frame supplied and installed | nr | ₦17,660,598 | ₦22,598 | ₦224,772 | ₦17,907,968 | |
| K11 | Mooring bollard 100t supplied and installed | nr | ₦8,307,312 | ₦12,445 | ₦112,386 | ₦8,432,143 | |
| K12 | Crane rail A120 on grouted pads with clips | m | ₦475,232 | ₦3,734 | ₦7,492 | ₦486,458 | |
| K13 | Floating silt curtain deployed and maintained | m | ₦102,962 | ₦1,228 | ₦1,116 | ₦105,306 | |
| K14 | Marine steel tubular pile 762mm driven from crane barge | m | ₦391,129 | ₦4,372 | ₦545,962 | ₦941,463 | |
| K15 | Bathymetric survey with survey boat | km | ₦0 | ₦2,604 | ₦38,883 | ₦41,487 | |
| K16 | Navigation buoy supplied and moored with 20m chain and sinker | nr | ₦30,102,330 | ₦117,900 | ₦2,851,700 | ₦33,071,930 | |
| L Railways | |||||||
| L01 | Standard-gauge track UIC60 on concrete sleepers (600mm c/c) incl. ballast, sub-ballast, fastenings and welds | m | ₦550,984 | ₦7,336 | ₦15,399 | ₦573,719 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| L02 | Aluminothermic rail weld | nr | ₦380,758 | ₦11,544 | ₦47,046 | ₦439,349 | |
| L03 | Turnout 1:12 UIC60 installed incl. ballast and tamping | nr | ₦254,547,860 | ₦281,650 | ₦5,854,030 | ₦260,683,540 | |
| L04 | Ballast top-up and tamping | m | ₦9,240 | ₦590 | ₦5,444 | ₦15,274 | |
| L05 | Friction buffer stop installed | nr | ₦17,510,598 | ₦31,440 | ₦374,620 | ₦17,916,658 | |
| N Power distribution | |||||||
| N01 | 33kV 1-core 240mm2 Cu XLPE cable laid in trench (per cable), with sand and warning tape | m | ₦56,682 | ₦1,277 | ₦0 | ₦57,959 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| N02 | 11kV 3-core 185mm2 Cu armoured cable laid in trench | m | ₦112,208 | ₦1,654 | ₦0 | ₦113,862 | |
| N03 | 33kV cable termination (3 phases) installed and tested | set | ₦450,000 | ₦72,050 | ₦0 | ₦522,050 | |
| N04 | 33kV cable straight-through joint | nr | ₦650,000 | ₦72,378 | ₦0 | ₦722,378 | |
| N05 | 33kV overhead line, ACSR 150 on 15m concrete poles at 60m spans | m | ₦18,467 | ₦5,256 | ₦1,981 | ₦25,704 | |
| N06 | 11kV ring main unit installed on concrete plinth with 3 terminations | nr | ₦36,062,475 | ₦149,340 | ₦230,665 | ₦36,442,480 | |
| N07 | 500kVA 11/0.415kV transformer installed on plinth with HV termination and 20m LV cable | nr | ₦19,514,033 | ₦145,410 | ₦374,620 | ₦20,034,063 | |
| N08 | 100kVA pole-mounted transformer on H-pole with fuses and arrester | nr | ₦7,375,000 | ₦86,460 | ₦461,330 | ₦7,922,790 | |
| N09 | Feeder pillar 800A installed on base | nr | ₦4,526,780 | ₦35,370 | ₦0 | ₦4,562,150 | |
| N10 | Prepaid meter single-phase installed with service cable | nr | ₦111,990 | ₦6,550 | ₦0 | ₦118,540 | |
| N11 | 132kV lattice tower steel erected | t | ₦3,770,615 | ₦137,550 | ₦299,696 | ₦4,207,861 | |
| N12 | 100kVA diesel generator installed with ATS, plinth and 15m LV cable | nr | ₦19,880,579 | ₦96,940 | ₦374,620 | ₦20,352,139 | |
| N13 | Lightning protection system for a typical 2-storey building (6 air terminals) | nr | ₦705,500 | ₦96,940 | ₦0 | ₦802,440 | |
| N14 | LV aerial bundled cable 3x70+54.6 on 9m concrete poles at 40m spans | m | ₦15,266 | ₦2,391 | ₦1,153 | ₦18,810 | |
| O Oil & gas | |||||||
| O01 | Line pipe 8" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trench | m | ₦105,795 | ₦3,611 | ₦2,644 | ₦112,049 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| O02 | Line pipe 12" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trench | m | ₦175,551 | ₦4,986 | ₦3,571 | ₦184,108 | |
| O03 | Line pipe 24" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trench | m | ₦417,031 | ₦10,562 | ₦10,382 | ₦437,974 | |
| O04 | Pipeline trench excavation 1.0m wide x 1.5m deep by excavator, spoil alongside | m | ₦0 | ₦344 | ₦3,674 | ₦4,018 | |
| O05 | Backfill pipeline trench with 300mm sand padding and excavated material, compacted | m | ₦2,205 | ₦573 | ₦1,956 | ₦4,734 | |
| O06 | Hydrostatic test, dewatering and drying of 12" pipeline | m | ₦280 | ₦156 | ₦116 | ₦552 | |
| O07 | HDD river/road crossing for 12" X52 3LPE pipeline incl. drilling fluid | m | ₦192,191 | ₦6,018 | ₦186,494 | ₦384,703 | |
| O08 | Magnesium anode 17lb installed with cable and test post share | nr | ₦175,787 | ₦9,989 | ₦0 | ₦185,776 | |
| O09 | Install 12" ANSI 150 gate valve with 2 weld-neck flanges, gaskets and bolting | nr | ₦6,492,498 | ₦88,425 | ₦187,310 | ₦6,768,233 | |
| O10 | Pipeline marker post set in concrete | nr | ₦47,008 | ₦1,719 | ₦0 | ₦48,728 | |
| O11 | Underground fuel tank 33,000L installed: excavation, sand surround, concrete anchor slab | nr | ₦10,295,598 | ₦108,730 | ₦668,520 | ₦11,072,848 | |
| O12 | Fuel dispenser installed with 6m 2" seamless product line and electrics | nr | ₦12,699,887 | ₦63,535 | ₦0 | ₦12,763,422 | |
| O13 | Fuel station canopy: steel frame, aluminium roof and ACP fascia | m2 | ₦92,700 | ₦11,839 | ₦4,620 | ₦109,158 | |
| O14 | Abrasive blast clean to Sa2.5 and apply 3-coat epoxy system to steelwork | m2 | ₦43,589 | ₦2,751 | ₦8,281 | ₦54,621 | |
| O15 | Radiographic testing of pipeline weld (service, incl. film) | nr | ₦35,000 | ₦573 | ₦0 | ₦35,573 | |
| O16 | Fabricate and erect steel storage tank shell/bottom/roof, per tonne of plate | t | ₦1,841,016 | ₦154,252 | ₦549,332 | ₦2,544,601 | |
| O17 | Install 12" pig launcher/receiver incl. tie-in welds | nr | ₦87,762,990 | ₦256,760 | ₦749,240 | ₦88,768,990 | |
| P Piling & ground engineering | |||||||
| P01 | Bored cast-in-place pile 600mm dia in C30/37 concrete incl. rebar cage and drilling fluid | m | ₦103,012 | ₦8,024 | ₦124,871 | ₦235,906 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| P02 | Bored cast-in-place pile 900mm dia in C30/37 concrete incl. rebar cage and drilling fluid | m | ₦220,185 | ₦13,018 | ₦198,217 | ₦431,420 | |
| P03 | Bored cast-in-place pile 1200mm dia in C30/37 concrete incl. rebar cage and drilling fluid | m | ₦372,701 | ₦18,012 | ₦290,437 | ₦681,151 | |
| P04 | Precast concrete pile 400x400mm supplied and driven | m | ₦149,350 | ₦1,441 | ₦22,687 | ₦173,478 | |
| P05 | Steel tubular pile 762x14mm supplied and driven incl. splices | m | ₦391,129 | ₦2,260 | ₦31,761 | ₦425,150 | |
| P06 | Steel sheet piling PU18, permanent, supplied and driven by vibro hammer | m2 | ₦171,734 | ₦835 | ₦10,947 | ₦183,516 | |
| P07 | Temporary sheet piling PU18 driven and extracted (30% material write-off/hire) | m2 | ₦50,020 | ₦1,376 | ₦21,893 | ₦73,288 | |
| P08 | Break down pile head 600mm and prepare starter bars | nr | ₦0 | ₦4,667 | ₦27,821 | ₦32,488 | |
| P09 | Pile integrity test (low-strain), per pile | nr | ₦30,000 | ₦0 | ₦0 | ₦30,000 | |
| P10 | Prefabricated vertical drains installed to 15m | m | ₦408 | ₦11.46 | ₦259 | ₦679 | |
| P11 | Gabion box 2x1x1m filled with hand-packed stone | nr | ₦79,988 | ₦9,416 | ₦13,298 | ₦102,701 | |
| P12 | Reno mattress 0.3m filled with stone | m2 | ₦17,331 | ₦2,702 | ₦0 | ₦20,033 | |
| P13 | Biaxial geogrid laid in fill | m2 | ₦3,388 | ₦45.85 | ₦0 | ₦3,434 | |
| P14 | HDPE geomembrane 1.5mm laid and welded (lining) | m2 | ₦8,154 | ₦226 | ₦36.86 | ₦8,416 | |
| P15 | Soil nail 25mm x 6m, drilled and grouted, with head plate | nr | ₦60,797 | ₦6,386 | ₦43,790 | ₦110,973 | |
| P16 | Ground/rock anchor 32mm bar, drilled and grouted | m | ₦13,301 | ₦1,572 | ₦27,679 | ₦42,551 | |
| P17 | Geosynthetic clay liner laid with overlaps | m2 | ₦9,919 | ₦57.31 | ₦0 | ₦9,976 | |
| P18 | Settlement plate installed and initial reading | nr | ₦85,000 | ₦18,668 | ₦0 | ₦103,668 | |
| P19 | Non-woven geotextile 400g/m2 laid as separator/filter | m2 | ₦2,662 | ₦34.39 | ₦0 | ₦2,696 | |
| Q Bridges & heavy structures | |||||||
| Q01 | Post-tensioning: 12x15.2mm tendons supplied, placed, stressed and grouted | t | ₦6,409,118 | ₦196,500 | ₦318,990 | ₦6,924,608 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| Q02 | Laminated elastomeric bearing supplied and installed | dm3 | ₦4,280 | ₦237 | ₦0 | ₦4,518 | |
| Q03 | Pot bearing 2,000kN supplied, installed and grouted | nr | ₦7,429,064 | ₦15,065 | ₦112,386 | ₦7,556,515 | |
| Q04 | Strip-seal expansion joint with C40 nosing and anchorage steel | m | ₦677,293 | ₦7,696 | ₦0 | ₦684,989 | |
| Q05 | Galvanised steel bridge parapet railing installed | m | ₦126,180 | ₦3,504 | ₦0 | ₦129,684 | |
| Q06 | Precast pre-tensioned I-girder (25m class) supplied and erected | m | ₦650,000 | ₦1,244 | ₦42,099 | ₦693,343 | |
| Q07 | Bridge deck waterproofing membrane on primed deck | m2 | ₦12,000 | ₦393 | ₦0 | ₦12,393 | |
| Q08 | C40/50 ready-mix concrete in bridge deck placed by boom pump | m3 | ₦214,200 | ₦6,354 | ₦8,490 | ₦229,044 | |
| Q09 | Aluminium system formwork to slab soffit (1 month hire per use) | m2 | ₦4,631 | ₦2,243 | ₦0 | ₦6,875 | |
| Q10 | Epoxy-coated reinforcement cut, bent and fixed | t | ₦1,432,620 | ₦91,700 | ₦0 | ₦1,524,320 | |
| Q11 | Deck drainage scupper installed | nr | ₦85,000 | ₦7,205 | ₦0 | ₦92,205 | |
| Q12 | Heavy-duty shoring tower, per tower per month incl. erect and dismantle | nr | ₦35,000 | ₦13,755 | ₦0 | ₦48,755 | |
| Q13 | Modular expansion joint installed with nosing concrete and anchorage | m | ₦2,864,973 | ₦18,340 | ₦37,462 | ₦2,920,775 | |
| R Roads & external | |||||||
| G01 | 60mm interlocking paving on 50mm sand bed, compacted | m2 | ₦9,750 | ₦1,433 | ₦198 | ₦11,381 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| G02 | 80mm interlocking paving on 50mm sand bed, compacted | m2 | ₦11,850 | ₦1,554 | ₦198 | ₦13,602 | |
| R01 | Scarify, water & compact subgrade to 95% MDD | m2 | ₦0 | ₦22.93 | ₦554 | ₦577 | |
| R02 | Laterite sub-base, spread & compacted in layers (compacted volume) | m3 | ₦9,896 | ₦229 | ₦3,502 | ₦13,628 | |
| R03 | Crushed stone base course, compacted (compacted volume) | m3 | ₦30,608 | ₦287 | ₦3,748 | ₦34,642 | |
| R04 | Prime coat MC-30 at 1.0 L/m2 | m2 | ₦1,522 | ₦11.46 | ₦119 | ₦1,653 | |
| R05 | Tack coat (emulsion) at 0.3 L/m2 | m2 | ₦346 | ₦5.73 | ₦67.59 | ₦420 | |
| R06 | Asphalt wearing course 50mm, laid & compacted | m2 | ₦19,364 | ₦58.95 | ₦1,058 | ₦20,481 | |
| R07 | Asphalt binder course 60mm, laid & compacted | m2 | ₦22,075 | ₦58.95 | ₦1,157 | ₦23,291 | |
| R08 | Precast road kerb 900x300x150 on concrete bed & haunch | m | ₦16,231 | ₦1,670 | ₦0 | ₦17,902 | |
| R09 | Precast 600mm U-drain with cover, laid on concrete bed | m | ₦60,062 | ₦2,374 | ₦5,767 | ₦68,203 | |
| R10 | In-situ RC drain 600x600 internal, 150mm walls & base, incl. excavation, formwork & rebar | m | ₦82,148 | ₦19,306 | ₦1,853 | ₦103,308 | |
| R11 | 900mm precast culvert pipe laid with 1:3:6 surround | m | ₦190,654 | ₦5,895 | ₦18,369 | ₦214,918 | |
| R12 | Thermoplastic road marking, 100mm line | m | ₦662 | ₦11.46 | ₦37.83 | ₦711 | |
| R13 | Chain-link fence 1.8m on angle posts @3m with 3 lines barbed wire | m | ₦11,083 | ₦1,818 | ₦0 | ₦12,901 | |
| R14 | 225mm block fence wall 2.4m high incl. foundation, piers, plaster both sides & razor wire | m | ₦68,869 | ₦17,710 | ₦0 | ₦86,579 | |
| R16 | Carpet grass laid on 100mm topsoil, watered | m2 | ₦2,422 | ₦368 | ₦0 | ₦2,790 | |
| R17 | Cement-stabilised base 150mm (5% cement) mixed in place and compacted | m2 | ₦5,490 | ₦34.39 | ₦1,442 | ₦6,966 | |
| R18 | Double surface dressing with emulsion and 10/14mm chippings | m2 | ₦3,620 | ₦22.93 | ₦275 | ₦3,918 | |
| R19 | Jointed concrete pavement C35/45 250mm with dowels, tie bars and sealed joints | m2 | ₦54,524 | ₦477 | ₦5,336 | ₦60,337 | |
| R20 | Asphalt base course 60mm laid and compacted | m2 | ₦21,058 | ₦58.95 | ₦1,157 | ₦22,274 | |
| R21 | HDPE twin-wall culvert 600mm laid on and surrounded with sand | m | ₦59,590 | ₦2,636 | ₦8,865 | ₦71,092 | |
| R22 | Precast box culvert 2x2m laid on blinding | m | ₦638,250 | ₦8,515 | ₦146,959 | ₦793,724 | |
| R23 | Precast concrete safety barrier installed | m | ₦96,900 | ₦458 | ₦7,689 | ₦105,047 | |
| R24 | Solar street light 60W on 6m pole with concrete base | nr | ₦438,945 | ₦14,410 | ₦23,066 | ₦476,422 | |
| R25 | Traffic signal installation, 4-way junction | set | ₦24,165,439 | ₦106,110 | ₦230,665 | ₦24,502,214 | |
| R26 | Retro-reflective road sign on galvanised post with concrete base | m2 | ₦134,689 | ₦4,912 | ₦0 | ₦139,601 | |
| R27 | Cold mill existing asphalt 50mm and remove | m2 | ₦0 | ₦11.46 | ₦1,980 | ₦1,992 | |
| R28 | Rubber speed hump installed | m | ₦39,480 | ₦573 | ₦0 | ₦40,053 | |
| R29 | Road marking with paint, 100mm line | m | ₦179 | ₦22.93 | ₦31.49 | ₦233 | |
| R30 | Gabion retaining wall (2x1x1 boxes) incl. geotextile backing | m3 | ₦54,842 | ₦9,416 | ₦13,298 | ₦77,555 | |
| S Steelwork | |||||||
| S01 | Structural steel UB/UC frame, fabricated, primed & erected | t | ₦1,591,990 | ₦221,062 | ₦711,612 | ₦2,524,664 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| S02 | Light steel roof trusses (angle/SHS), fabricated, primed & erected | t | ₦1,598,700 | ₦178,488 | ₦649,120 | ₦2,426,308 | |
| S03 | Galvanised Z-purlin 150mm fixed to trusses | m | ₦8,941 | ₦606 | ₦0 | ₦9,547 | |
| S04 | Steel handrail/balustrade 1m high, 2" pipe & 25mm SHS, painted | m | ₦26,250 | ₦9,334 | ₦0 | ₦35,583 | |
| S05 | Wrought-iron burglary-proof to windows, supply & fix | m2 | ₦35,000 | ₦229 | ₦0 | ₦35,229 | |
| V Water & sewerage | |||||||
| V01 | HDPE PE100 SDR17 pipe 110mm laid and butt-fused in trench on sand bed | m | ₦9,466 | ₦698 | ₦343 | ₦10,507 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| V02 | HDPE PE100 SDR17 pipe 160mm laid and butt-fused in trench on sand bed | m | ₦19,596 | ₦930 | ₦458 | ₦20,984 | |
| V03 | HDPE PE100 SDR17 pipe 250mm laid and butt-fused in trench on sand bed | m | ₦47,150 | ₦1,425 | ₦2,016 | ₦50,591 | |
| V04 | HDPE PE100 SDR17 pipe 400mm laid and butt-fused in trench on sand bed | m | ₦119,536 | ₦2,211 | ₦3,043 | ₦124,790 | |
| V05 | Ductile iron pipe DN150 laid in trench on sand bed | m | ₦42,674 | ₦1,277 | ₦1,773 | ₦45,724 | |
| V06 | Ductile iron pipe DN300 laid in trench on sand bed | m | ₦96,442 | ₦2,178 | ₦2,955 | ₦101,575 | |
| V07 | uPVC sewer pipe 200mm laid on granular bed | m | ₦15,811 | ₦1,146 | ₦0 | ₦16,957 | |
| V08 | DI gate valve DN150 installed in block chamber with cover | nr | ₦847,171 | ₦30,785 | ₦0 | ₦877,956 | |
| V09 | Pillar fire hydrant with isolating valve installed | nr | ₦1,783,906 | ₦24,562 | ₦0 | ₦1,808,469 | |
| V10 | Bulk water meter DN100 with 2 valves in chamber | nr | ₦2,889,453 | ₦47,324 | ₦0 | ₦2,936,777 | |
| V11 | Domestic water connection 15mm with meter and stopcock | nr | ₦59,820 | ₦12,281 | ₦0 | ₦72,101 | |
| V12 | Precast manhole 1200mm dia, 2m deep, with D400 cover | nr | ₦606,328 | ₦28,492 | ₦221,712 | ₦856,533 | |
| V13 | Two-chamber septic tank (10m3) in solid blockwork with RC cover, and soakaway | nr | ₦1,860,104 | ₦252,830 | ₦265,950 | ₦2,378,884 | |
| V14 | GRP sectional water tank on steel base frame, installed | m3 | ₦388,274 | ₦8,499 | ₦0 | ₦396,773 | |
| V15 | Package sewage treatment plant 50m3/day installed on concrete base | nr | ₦95,397,756 | ₦265,275 | ₦749,240 | ₦96,412,271 | |
| V16 | Submersible pump 5.5HP installed in borehole with riser and cable | nr | ₦1,425,920 | ₦52,400 | ₦0 | ₦1,478,320 | |
| V17 | Rapid gravity filter media (graded sand) placed | m3 | ₦58,800 | ₦2,292 | ₦0 | ₦61,093 | |
| V18 | Butterfly valve DN300 installed | nr | ₦1,264,654 | ₦24,562 | ₦92,266 | ₦1,381,483 | |
| W Waterproofing | |||||||
| W01 | 4mm torch-on bitumen membrane on primed concrete slab | m2 | ₦6,543 | ₦1,146 | ₦0 | ₦7,689 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| W02 | Cementitious waterproofing, 2 coats, to wet areas/tanks | m2 | ₦7,219 | ₦655 | ₦0 | ₦7,874 | |
| W03 | 2 coats bituminous paint to substructure walls | m2 | ₦1,444 | ₦172 | ₦0 | ₦1,616 | |
| W04 | Polyurethane liquid membrane to roof/balcony | m2 | ₦19,688 | ₦786 | ₦0 | ₦20,474 | |
| X Fire, HVAC, lifts & ICT | |||||||
| X01 | Addressable smoke detection point with 15m FP cable in conduit | pt | ₦80,750 | ₦6,878 | ₦0 | ₦87,628 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| X02 | Addressable fire alarm panel 2-loop installed and commissioned | nr | ₦6,809,677 | ₦65,500 | ₦0 | ₦6,875,177 | |
| X03 | Manual call point with 15m FP cable in conduit | nr | ₦93,750 | ₦4,912 | ₦0 | ₦98,662 | |
| X04 | Sounder-beacon with 15m FP cable in conduit | nr | ₦120,303 | ₦4,912 | ₦0 | ₦125,215 | |
| X05 | Sprinkler head with 3m 1" galvanised branch pipe and hangers | nr | ₦28,107 | ₦5,895 | ₦0 | ₦34,002 | |
| X06 | Fire hose reel cabinet installed with 12m 1" supply | nr | ₦357,240 | ₦14,082 | ₦0 | ₦371,322 | |
| X07 | Dry powder extinguisher 9kg wall-mounted with sign | nr | ₦42,000 | ₦344 | ₦0 | ₦42,344 | |
| X08 | Fire pump set 500gpm installed on base and commissioned | set | ₦74,518,032 | ₦242,350 | ₦374,620 | ₦75,135,002 | |
| X09 | VRF air-conditioning per HP installed (outdoor, cassette share, piping, refrigerant) | HP | ₦2,237,860 | ₦15,392 | ₦0 | ₦2,253,252 | |
| X10 | Ceiling cassette split AC 3HP installed with 6m piping | nr | ₦1,890,950 | ₦29,639 | ₦0 | ₦1,920,589 | |
| X11 | Galvanised ductwork with insulation installed | m2 | ₦31,955 | ₦3,537 | ₦0 | ₦35,492 | |
| X12 | Ceiling diffuser installed and balanced | nr | ₦45,000 | ₦3,275 | ₦0 | ₦48,275 | |
| X13 | Passenger lift 8-person 5 stops incl. builder's attendance | nr | ₦89,552,172 | ₦45,850 | ₦0 | ₦89,598,022 | |
| X14 | Escalator 4.5m rise incl. builder's attendance and lifting | nr | ₦184,834,090 | ₦68,775 | ₦1,322,660 | ₦186,225,525 | |
| X15 | Cat6 data point (avg 30m) with outlet and patch panel share | pt | ₦29,492 | ₦5,404 | ₦0 | ₦34,895 | |
| X16 | IP CCTV camera installed with 25m Cat6 and NVR share | nr | ₦96,484 | ₦7,205 | ₦0 | ₦103,690 | |
| X17 | Access-controlled door (reader, maglock, exit button) | nr | ₦357,612 | ₦27,182 | ₦0 | ₦384,795 | |
| X18 | Solar water heater 200L installed and connected | nr | ₦867,325 | ₦28,165 | ₦0 | ₦895,490 | |
| X19 | Air-cooled chiller per TR installed | TR | ₦1,459,216 | ₦15,392 | ₦8,818 | ₦1,483,427 | |
| X20 | Goods lift 1000kg 3 stops incl. builder's attendance | nr | ₦101,172,344 | ₦45,850 | ₦0 | ₦101,218,194 | |
| Y Industrial buildings | |||||||
| Y01 | PU sandwich roof panel 50mm fixed to purlins incl. flashings | m2 | ₦37,212 | ₦1,015 | ₦1,090 | ₦39,318 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| Y02 | PU sandwich wall panel 50mm fixed to rails | m2 | ₦32,687 | ₦1,146 | ₦1,246 | ₦35,079 | |
| Y03 | Galvanised rolling shutter (manual) installed | m2 | ₦55,000 | ₦3,275 | ₦0 | ₦58,275 | |
| Y04 | Insulated sectional door 4x4m motorised, installed | nr | ₦7,393,364 | ₦45,850 | ₦0 | ₦7,439,214 | |
| Y05 | Overhead crane 10t x 20m span installed incl. 80m crane rail | nr | ₦129,905,290 | ₦432,300 | ₦2,645,320 | ₦132,982,910 | |
| Y06 | Dry-shake floor hardener (5kg/m2) power-floated into slab | m2 | ₦6,300 | ₦295 | ₦127 | ₦6,721 | |
| Y07 | Cold-room PU panel 100mm installed | m2 | ₦117,978 | ₦2,030 | ₦0 | ₦120,008 | |
| Y08 | Pre-engineered steel building frame (approx. 35kg/m2), primed and erected | m2 | ₦54,989 | ₦5,895 | ₦4,295 | ₦65,179 | |
| Y09 | Hydraulic dock leveller installed in pit | nr | ₦10,953,371 | ₦45,850 | ₦0 | ₦10,999,221 | |
| Z Site, testing & surveys | |||||||
| Z01 | Concrete cube test, set of 3 incl. sampling | set | ₦15,000 | ₦573 | ₦0 | ₦15,573 | |
Advertise here Put your business beside this price. Buyers call you directly. ₦26,875/moFounding ₦16,125/mo · 6 left₦25,000 ex-VAT. 7.5% VAT ₦1,875. Total ₦26,875. Founding ₦15,000 ex-VAT. 7.5% VAT ₦1,125. Total ₦16,125. Each click deducts its ex-VAT price from credit, ₦500 for a website click and ₦1,000 for a WhatsApp or call click. VAT is billed on the top-up. There are no city or material multipliers, and a second slot costs the same as the first. Credit expires after 12 months, and only unused credit is refunded. WHT and TIN are handled by Accounting. Advertising fee for this row. It is not a material rate. Prices above the strip are Buildocrat's independent rates. | |||||||
| Z02 | Geotechnical borehole with SPT (service) | m | ₦35,000 | ₦0 | ₦0 | ₦35,000 | |
| Z03 | Cone penetration test (service) | m | ₦18,000 | ₦0 | ₦0 | ₦18,000 | |
| Z04 | Plate load test incl. reaction load | nr | ₦450,000 | ₦0 | ₦265,950 | ₦715,950 | |
| Z05 | Static pile load test up to 300t incl. attendance | nr | ₦8,500,000 | ₦27,510 | ₦1,498,480 | ₦10,025,990 | |
| Z06 | High-strain dynamic pile test (PDA) | nr | ₦650,000 | ₦0 | ₦0 | ₦650,000 | |
| Z07 | Topographic survey with total station (in-house) | ha | ₦0 | ₦12,071 | ₦7,500 | ₦19,571 | |
| Z08 | Setting out with surveyor and 2 chainmen | day | ₦0 | ₦40,237 | ₦25,000 | ₦65,237 | |
| Z09 | Site hoarding 2.4m, corrugated sheets on timber posts, painted | m | ₦15,843 | ₦3,930 | ₦0 | ₦19,773 | |
| Z10 | Field density test (sand replacement) | nr | ₦15,000 | ₦0 | ₦0 | ₦15,000 | |
| Z11 | CBR test | nr | ₦30,000 | ₦0 | ₦0 | ₦30,000 | |
| Z12 | Rebar tensile and bend test | nr | ₦25,000 | ₦0 | ₦0 | ₦25,000 | |
| Z13 | Ultrasonic weld test, per joint | nr | ₦20,000 | ₦0 | ₦0 | ₦20,000 | |
| Z14 | Asphalt core and extraction test | nr | ₦40,000 | ₦0 | ₦0 | ₦40,000 | |
| Z15 | Water quality analysis (full suite) | nr | ₦85,000 | ₦0 | ₦0 | ₦85,000 | |