Net unit rate in Abuja, excluding overheads, profit and VAT

₦85,000per unit

Tender rate about ₦113,453 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for water quality analysis (full suite) is ₦85,000 per unit in Abuja: ₦85,000 materials, ₦0 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦113,453 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialWater quality analysis (full)1 unit-₦85,000₦85,000
Materials₦85,000
Labour₦0
Plant₦0
Net unit rate per unit₦85,000

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦85,000₦113,453
Lagos₦90,100₦120,261
Port Harcourt₦91,800₦122,530
Ibadan₦80,750₦107,781
Osogbo (Osun)₦81,600₦108,915
Kano₦79,050₦105,512
Kaduna₦79,900₦106,646
Enugu₦83,300₦111,184
Benin City₦84,150₦112,319
Uyo₦87,550₦116,857
Jos₦80,750₦107,781
Riverine / creek site₦110,500₦147,490

Related site, testing & surveys rates

Frequently asked questions

How much does water quality analysis (full suite) cost per unit in Nigeria?

About ₦85,000 per unit net in Abuja as at 15 October 2026, or about ₦113,453 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦90,100 per unit and the tender rate about ₦120,261 per unit.

What does the rate include?

Materials (Water quality analysis (full)) with waste allowances; labour (no labour) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/z15-water-quality-analysis-full-suite/, prices as at 15 October 2026.