Site hoarding 2.4m, corrugated sheets on timber posts, painted: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦21,291per m

Tender rate about ₦28,418 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for site hoarding 2.4m, corrugated sheets on timber posts, painted is ₦21,291 per m in Abuja: ₦17,361 materials, ₦3,930 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦28,418 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialCorrugated galvanised sheet for hoarding, per sheet1 sheet5%₦9,500₦9,975
Material2"x4"x12' hardwood (Gmelina/Akpontu)0.6 length10%₦4,800₦3,168
Material2"x3"x12' hardwood0.6 length10%₦3,500₦2,310
MaterialWire nails, assorted, per kg0.3 kg10%₦2,600₦858
MaterialEmulsion paint, per litre0.4 litre5%₦2,500₦1,050
Labour (hours)Carpenter (formwork & roof)1 h-₦2,784₦2,784
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦17,361
Labour₦3,930
Plant₦0
Net unit rate per m₦21,291

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦21,291₦28,418
Lagos₦22,647₦30,228
Port Harcourt₦22,483₦30,010
Ibadan₦19,637₦26,210
Osogbo (Osun)₦19,614₦26,180
Kano₦19,093₦25,485
Kaduna₦19,385₦25,874
Enugu₦20,158₦26,906
Benin City₦20,410₦27,242
Uyo₦21,222₦28,326
Jos₦19,558₦26,105
Riverine / creek site₦26,892₦35,894

Related site, testing & surveys rates

Frequently asked questions

How much does site hoarding 2.4m, corrugated sheets on timber posts, painted cost per m in Nigeria?

About ₦21,291 per m net in Abuja as at 15 October 2026, or about ₦28,418 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦22,647 per m and the tender rate about ₦30,228 per m.

What does the rate include?

Materials (2"x3"x12' hardwood, 2"x4"x12' hardwood (Gmelina/Akpontu), Corrugated galvanised sheet for hoarding, Emulsion paint, Wire nails) with waste allowances; labour (Carpenter (formwork & roof), Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/z09-site-hoarding-2-4m-corrugated-sheets-on-timber-posts-pai/, prices as at 15 October 2026.