Setting out with surveyor and 2 chainmen: cost per day in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦65,237per day

Tender rate about ₦87,075 per day with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for setting out with surveyor and 2 chainmen is ₦65,237 per day in Abuja: ₦0 materials, ₦40,237 labour and ₦25,000 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦87,075 per day.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Total station1 day-₦25,000₦25,000
Labour (hours)Land surveyor8 h-₦2,410₦19,277
Labour (hours)Chainman / survey assistant16 h-₦1,310₦20,960
Materials₦0
Labour₦40,237
Plant₦25,000
Net unit rate per day₦65,237

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per dayTender rate incl. OH&P and VAT
Abuja (FCT)₦65,237₦87,075
Lagos₦69,706₦93,040
Port Harcourt₦65,225₦87,059
Ibadan₦55,940₦74,665
Osogbo (Osun)₦54,428₦72,647
Kano₦53,928₦71,980
Kaduna₦55,135₦73,591
Enugu₦56,690₦75,666
Benin City₦57,994₦77,408
Uyo₦59,951₦80,020
Jos₦55,635₦74,258
Riverine / creek site₦79,261₦105,793

Related site, testing & surveys rates

Frequently asked questions

How much does setting out with surveyor and 2 chainmen cost per day in Nigeria?

About ₦65,237 per day net in Abuja as at 15 October 2026, or about ₦87,075 per day as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦69,706 per day and the tender rate about ₦93,040 per day.

What does the rate include?

Materials (no materials) with waste allowances; labour (Chainman / survey assistant, Land surveyor) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Total station) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/z08-setting-out-with-surveyor-and-2-chainmen/, prices as at 15 October 2026.