BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Construction unit rates for BoQs in Nigeria

330 first-principles bill of quantities (BoQ) unit rates for Nigeria as at 15 October 2026, covering earthworks, concrete, reinforcement, formwork, blockwork, roofing, finishes, doors and windows, electrical, plumbing, steelwork, waterproofing, roads and drainage. Rates are net (Abuja) and show the materials, labour and plant split. Open any item for its full build-up and rates in 12 locations.

Earthworks

Concrete

CodeItemUnitMaterialsLabourPlantNet rate
B01Plain concrete 1:3:6 in blinding (site-mixed)m³₦86,480₦9,334₦2,903₦98,716
B02Reinforced concrete 1:2:4 in foundations / bases / ground beamsm³₦109,596₦12,854₦5,273₦127,723
B03Reinforced concrete 1:2:4 in suspended slabs, beams & columnsm³₦109,596₦19,896₦6,327₦135,819
B04Reinforced concrete 1:1.5:3 (~C25) in suspended slabs & beamsm³₦129,298₦19,896₦6,327₦155,521
B05Ready-mix C25/30 placed by pump in suspended slabm³₦175,900₦4,831₦493₦181,224
B06High-yield reinforcement 12-16mm, cut, bent & fixedtonne₦1,126,440₦81,875₦0₦1,208,315
B07Formwork (plank) to sides of foundations & ground beamsm²₦3,757₦3,701₦0₦7,457
B08Formwork (marine board) to soffit of suspended slab incl. propping n.e. 3.5mm²₦5,844₦5,551₦0₦11,395
B09Formwork (marine board) to columns and beamsm²₦5,403₦5,600₦0₦11,003
B10BRC mesh A142 in ground slab incl. lapsm²₦4,933₦180₦0₦5,113
B11High-yield reinforcement 20-25mm, cut, bent & fixedtonne₦1,139,460₦62,552₦0₦1,202,012
B12Reinforcement 8-10mm links/stirrups, cut, bent & fixedtonne₦1,190,910₦115,935₦0₦1,306,845
B13Formwork (marine board) to wallsm²₦5,595₦5,044₦0₦10,639
B14Formwork to staircase soffits, strings & risersm²₦8,256₦8,679₦0₦16,935
B15Ready-mix C30/37 placed by pump in columns & wallsm³₦191,060₦6,386₦658₦198,104
B16Power-floated finish to concrete slabm²₦0₦247₦129₦377
B17Precast lintel 150x225x1500, supply and bed in mortarunit₦18,607₦1,081₦0₦19,688
B18Ready-mix C35/45 placed by boom pump in raft/transfer slabm³₦195,840₦3,766₦5,133₦204,739
B19Formwork to slab using steel props (props hired)m²₦3,958₦4,487₦2,100₦10,545
B20Rib-and-block (hollow pot) suspended slab 225mm incl. topping & rib rebar (excl. propping)m²₦34,739₦3,562₦370₦38,670

Masonry

CodeItemUnitMaterialsLabourPlantNet rate
C01225mm hollow sandcrete blockwork in cement-sand mortar 1:6m²₦11,109₦1,670₦0₦12,779
C02150mm hollow sandcrete blockwork in cement-sand mortar 1:6m²₦8,833₦1,433₦0₦10,266
C03225mm hollow blockwork filled solid with 1:2:4 concrete, below DPCm²₦17,678₦2,849₦0₦20,527
C04CROSS-CHECK: produce 9" hollow sandcrete block on site (machine), curedunit₦583₦86.46₦40.46₦710
C05125mm hollow blockwork partition in mortar 1:6m²₦7,268₦1,253₦0₦8,521
C06Half-brick burnt clay facing brickwork in mortar 1:4, pointedm²₦30,856₦4,094₦0₦34,949
C07225mm solid block walling in mortar 1:6m²₦13,174₦1,850₦0₦15,024
C08Bituminous felt DPC 225mm wide bedded on wallsm₦827₦123₦0₦950

Roofing

CodeItemUnitMaterialsLabourPlantNet rate
D01Timber roof: 2x4 trusses/rafters, 2x3 purlins, 2x6 wall plate, treated (slope area)m²₦6,161₦2,686₦0₦8,846
D020.55mm longspan aluminium (Grade A) on timber purlins incl. laps, ridges & fixingsm²₦9,815₦1,015₦0₦10,830
D03Stone-coated steel tiles on 2x2 battens incl. fixingsm²₦14,838₦1,523₦0₦16,360
D04PVC fascia board fixed to rafter endsm₦6,064₦696₦0₦6,760
D050.55mm longspan aluminium, caliper grade, on purlinsm²₦15,527₦1,015₦0₦16,542
D060.45mm longspan aluminium (market) on purlinsm²₦8,135₦1,015₦0₦9,150
D07Step-tile/Metcopo aluminium 0.55mm on purlinsm²₦10,863₦1,146₦0₦12,009
D080.55mm caliper longspan on steel purlins with self-drilling screwsm²₦15,897₦1,015₦0₦16,912
D09Aluminium gutter with bracketsm₦8,269₦901₦0₦9,169
D10110mm uPVC rainwater downpipe with clipsm₦2,661₦557₦0₦3,218
D11Reflective foil insulation laid over purlinsm²₦2,178₦131₦0₦2,309
D12PVC soffit/eaves panels on 2x2 framingm²₦8,889₦1,621₦0₦10,510
D13Stone-coated ridge/hip cappingm₦13,596₦655₦0₦14,251

Finishes

CodeItemUnitMaterialsLabourPlantNet rate
E0115mm internal plaster, cement-sand 1:6, to blockworkm²₦1,417₦1,785₦0₦3,202
E0220mm external render, cement-sand 1:4m²₦2,477₦2,231₦0₦4,708
E0340mm cement-sand 1:3 floor screedm²₦4,987₦1,318₦0₦6,305
E04600x600 ceramic floor tiles (mid-range) on adhesive, groutedm²₦11,870₦2,006₦0₦13,875
E05600x600 polished porcelain floor tiles (premium) on adhesive, groutedm²₦28,995₦2,374₦0₦31,369
E06300x600 wall tiles on adhesive, groutedm²₦11,239₦2,497₦0₦13,736
E07Skim coat + 3 coats emulsion to internal plastered wallsm²₦1,601₦774₦0₦2,375
E082 coats weathershield paint to external renderm²₦998₦614₦0₦1,612
E0912.5mm gypsum board ceiling on 2x2 frame, POP-jointedm²₦6,424₦1,531₦0₦7,955
E10600x600 matt anti-slip porcelain floor tiles on adhesivem²₦17,655₦2,252₦0₦19,907
E11400x400 ceramic floor tiles on adhesivem²₦8,712₦1,883₦0₦10,595
E1220mm local polished granite flooring on mortar bedm²₦54,865₦4,863₦0₦59,729
E1320mm imported marble flooring on mortar bedm²₦98,865₦5,420₦0₦104,285
E14SPC vinyl click flooring on underlaym²₦8,100₦737₦0₦8,837
E15100mm tile skirting on adhesivem₦2,340₦368₦0₦2,709
E16Sealer + skim + 3 coats silk emulsion to internal wallsm²₦2,286₦876₦0₦3,162
E17Knot, prime & 3 coats gloss to wood or metalm²₦2,698₦921₦0₦3,620
E18Sand-textured coating + 2 coats weathershield, externalm²₦3,832₦1,240₦0₦5,073
E19POP screeding (skimming) to walls/ceilingsm²₦1,134₦827₦0₦1,961
E20Plain POP false ceiling on 2x2 timber framem²₦5,770₦2,595₦0₦8,366
E21PVC ceiling panels on 2x2 framem²₦7,733₦1,003₦0₦8,736
E22600x600 acoustic ceiling tiles on exposed T-gridm²₦13,125₦1,003₦0₦14,128
E23POP cornicem₦2,889₦475₦0₦3,364
E24Natural stone wall cladding on adhesivem²₦24,480₦2,800₦0₦27,280
E252-coat epoxy floor coatingm²₦5,985₦614₦0₦6,599
E268mm laminate flooring on underlaym²₦9,720₦835₦0₦10,555
E27Carpet tiles on adhesivem²₦14,700₦614₦0₦15,314
E28Gypsum drywall partition, 12.5mm board both sides on metal studsm²₦12,316₦2,243₦0₦14,560
E29Raised access floor 600x600 on adjustable pedestalsm²₦108,892₦1,212₦0₦110,104
E30Terrazzo floor 25mm laid, ground and polishedm²₦19,143₦4,831₦1,000₦24,974
E31HPL toilet cubicle partition installedunit₦650,000₦19,978₦0₦669,978
E32Roller blind supplied and fixedm²₦22,000₦884₦0₦22,884
E33Hardwood parquet laid on adhesive, sanded and sealedm²₦32,730₦3,128₦500₦36,358
E34HPL exterior cladding on steel sub-framem²₦147,106₦4,110₦0₦151,216
E35Aluminium louvre system installedm²₦75,000₦3,406₦0₦78,406
E36Acoustic wall panels on timber battensm²₦33,345₦2,227₦0₦35,572
E37Rubber gym flooring 15mm laidm²₦30,870₦737₦0₦31,607
E38Homogeneous vinyl sheet flooring, coved and weldedm²₦23,579₦1,474₦0₦25,053
E39Aluminium-framed glass skylight installed and sealedm²₦164,725₦8,351₦0₦173,076

Electrical

CodeItemUnitMaterialsLabourPlantNet rate
F01Lighting point: 1.5mm2 in 20mm conduit (avg 8m), switch share, LED downlightpoint₦24,660₦4,372₦0₦29,032
F0213A socket point: 2.5mm2 in 20mm conduit (avg 10m), twin socketpoint₦34,105₦5,281₦0₦39,386
F22AC/cooker point: 4mm2 in 25mm conduit (avg 12m), 15A outletpoint₦64,190₦6,796₦0₦70,986
F2312-way TPN distribution board with 12 MCBs, installedunit₦139,000₦21,124₦0₦160,124
F24100A 4-pole manual changeover switch, installedunit₦75,000₦13,591₦0₦88,591
F2516mm2 4-core armoured sub-main cable laid in trench/on traym₦22,660₦1,367₦0₦24,027
F2625mm2 4-core armoured cable laidm₦36,050₦1,633₦0₦37,683
F27Earthing: copper-bonded rod, 10mm2 conductor, inspection pitunit₦58,458₦11,381₦0₦69,839
F28LED panel 600x600 fitting, supply & fixunit₦18,000₦1,515₦0₦19,515
F2956" ceiling fan with regulator, supply & fixunit₦45,000₦4,544₦0₦49,544
F30Split AC 1.5HP inverter, supply & install (5m pipe run)unit₦684,125₦21,942₦0₦706,068
F31LED street light 100W on 8m pole with concrete base, installedunit₦402,413₦25,054₦46,133₦473,600
F325kVA hybrid solar system: 8x550W, 5kVA inverter, 10kWh LiFePO4, installedunit₦4,888,400₦72,050₦0₦4,960,450
F33Smoke detector, supply & fixunit₦12,000₦1,515₦0₦13,515

Plumbing

CodeItemUnitMaterialsLabourPlantNet rate
F03WC suite (mid-range), supplied, fixed & connectedunit₦132,980₦9,825₦0₦142,805
F04Wash hand basin with pedestal & mixer, fixed & connectedunit₦93,978₦7,696₦0₦101,674
F05Single-bowl stainless kitchen sink with mixer, fixed & connectedunit₦79,975₦7,696₦0₦87,671
F06WC suite (economy), supplied, fixed & connectedunit₦82,980₦9,825₦0₦92,805
F07WC one-piece (premium), supplied, fixed & connectedunit₦357,980₦11,217₦0₦369,197
F08Acrylic bathtub 1.7m with mixer, fixed & connectedunit₦286,038₦16,866₦0₦302,904
F09Shower mixer set with head & floor drain, installedunit₦64,990₦9,825₦0₦74,815
F10Urinal with flush valve, fixed & connectedunit₦124,042₦9,825₦0₦133,868
F11Electric water heater 50L, installedunit₦155,775₦9,989₦0₦165,764
F12Cold water point, 20mm PPR (avg 6m run)point₦12,384₦3,783₦0₦16,167
F13Hot water point, 25mm PPR (avg 6m run)point₦15,240₦4,339₦0₦19,579
F14Soil & waste point, uPVC 110/50mmpoint₦20,388₦4,912₦0₦25,300
F152,000L tank on 6m steel stand, installed & connectedunit₦648,325₦14,574₦0₦662,899
F161HP surface pump with valves, installedunit₦119,000₦11,381₦0₦130,381
F17Borehole drilling in basement rock, Abuja (subcontract)m₦22,000₦0₦0₦22,000
F18Complete borehole 120m: survey, drilling, casing, 1.5HP pump, tank stand & 2,000L tankunit₦4,167,325₦87,115₦0₦4,254,440
F19Inspection chamber 600x600x750 in 150mm block with coverunit₦86,545₦22,598₦0₦109,142
F20110mm uPVC underground drain on sand bed (excl. trench)m₦3,942₦1,146₦0₦5,088

Demolition

CodeItemUnitMaterialsLabourPlantNet rate
H01Demolish 225mm blockwork wall, stack debris on sitem²₦0₦1,376₦0₦1,376
H02Break up 150mm concrete slab with excavator breaker, load debrism²₦0₦458₦16,483₦16,942
H03Break out reinforced concrete with compressor & breakersm³₦0₦9,170₦74,188₦83,358

Doors & windows

CodeItemUnitMaterialsLabourPlantNet rate
J01Flush door 900x2100 with frame & ironmongery, supply & fixunit₦111,236₦12,281₦0₦123,517
J02Hardwood panel door with frame, lock, handles & hinges, supply & fixunit₦310,125₦19,159₦0₦329,284
J03Steel security door 1200, supply & fix with groutingunit₦424,059₦9,661₦0₦433,720
J04Aluminium casement window, 5mm glass & net, s&f incl. making goodm²₦95,247₦737₦0₦95,984
J05Aluminium sliding window, s&f incl. making goodm²₦80,247₦737₦0₦80,984
J06uPVC casement window, s&f incl. making goodm²₦150,247₦737₦0₦150,984
J07Frameless 12mm tempered glass door, s&fm²₦180,000₦344₦0₦180,344
J08Stick curtain wall, tinted glass, s&fm²₦260,000₦229₦0₦260,229
J09Aluminium hinged door with glazing, s&fm²₦110,000₦737₦0₦110,737
J10Fire-rated steel door 1hr with closer, supply & fixunit₦953,708₦9,661₦0₦963,369
J11Kitchen base cabinets with granite worktop, installedm₦400,000₦9,989₦0₦409,989
J12Kitchen wall cabinets, installedm₦200,000₦5,895₦0₦205,895
J13Built-in wardrobe, installedm²₦95,000₦4,421₦0₦99,421
J14Steel sliding/swing gate, fabricated & installedm²₦86,236₦1,801₦0₦88,037

Marine & dredging

CodeItemUnitMaterialsLabourPlantNet rate
K01Dredge & hydraulically place sand fill by 12" CSD (in-situ m3)m³₦0₦11.46₦3,471₦3,483
K02Hydraulic sand fill by 20" cutter suction dredger incl. discharge line, placed (in-situ m3)m³₦755₦11.46₦3,378₦4,144
K03Hydraulic sand fill by trailing suction hopper dredger (rainbowing/pump-ashore), placedm³₦400₦2.29₦2,505₦2,907
K04Spread and compact reclaimed sand in layersm³₦0₦11.46₦1,142₦1,154
K05Armour rock 3-6t placed to revetment/breakwater profiletonne₦39,140₦188₦7,315₦46,643
K06Core rock 1-500kg placed and trimmedtonne₦22,660₦34.39₦2,600₦25,294
K07Underlayer rock 50-300kg placedtonne₦26,780₦45.85₦2,537₦29,363
K08Geotextile under revetment laid incl. underwater placementm²₦2,783₦303₦286₦3,372
K09Concrete armour unit (2m3 class) cast in C35/45 and placedm³₦206,477₦8,744₦53,281₦268,502
K10Cone fender SCN1000 with frontal frame supplied and installedunit₦16,885,800₦22,598₦224,772₦17,133,170
K11Mooring bollard 100t supplied and installedunit₦7,956,840₦12,445₦112,386₦8,081,671
K12Crane rail A120 on grouted pads with clipsm₦460,847₦3,734₦7,492₦472,073
K13Floating silt curtain deployed and maintainedm₦98,759₦1,228₦1,142₦101,130
K14Marine steel tubular pile 762mm driven from crane bargem₦499,259₦4,372₦545,962₦1,049,593
K15Bathymetric survey with survey boatkm₦0₦2,604₦39,470₦42,074
K16Navigation buoy supplied and moored with 20m chain and sinkerunit₦28,911,000₦117,900₦2,851,700₦31,880,600

Railways

CodeItemUnitMaterialsLabourPlantNet rate
L01Standard-gauge track UIC60 on concrete sleepers (600mm c/c) incl. ballast, sub-ballast, fastenings and weldsm₦585,103₦7,336₦15,451₦607,890
L02Aluminothermic rail weldunit₦365,215₦11,544₦47,046₦423,806
L03Turnout 1:12 UIC60 installed incl. ballast and tampingunit₦244,223,000₦281,650₦5,854,030₦250,358,680
L04Ballast top-up and tampingm₦9,240₦590₦5,444₦15,274
L05Friction buffer stop installedunit₦16,795,800₦31,440₦374,620₦17,201,860

Power distribution

CodeItemUnitMaterialsLabourPlantNet rate
N0133kV 1-core 240mm2 Cu XLPE cable laid in trench (per cable), with sand and warning tapem₦56,682₦1,277₦0₦57,959
N0211kV 3-core 185mm2 Cu armoured cable laid in trenchm₦112,208₦1,654₦0₦113,862
N0333kV cable termination (3 phases) installed and testedset₦450,000₦72,050₦0₦522,050
N0433kV cable straight-through jointunit₦650,000₦72,378₦0₦722,378
N0533kV overhead line, ACSR 150 on 15m concrete poles at 60m spansm₦18,433₦5,256₦1,992₦25,681
N0611kV ring main unit installed on concrete plinth with 3 terminationsunit₦34,623,444₦149,340₦230,665₦35,003,449
N07500kVA 11/0.415kV transformer installed on plinth with HV termination and 20m LV cableunit₦68,501,578₦145,410₦374,620₦69,021,608
N08100kVA pole-mounted transformer on H-pole with fuses and arresterunit₦23,375,000₦86,460₦461,330₦23,922,790
N09Feeder pillar 800A installed on baseunit₦4,524,720₦33,405₦0₦4,558,125
N10Prepaid meter single-phase installed with service cableunit₦106,000₦6,059₦0₦112,059
N11132kV lattice tower steel erectedtonne₦3,616,696₦137,550₦299,696₦4,053,942
N12100kVA diesel generator installed with ATS, plinth and 15m LV cableunit₦34,871,144₦91,045₦374,620₦35,336,809
N13Lightning protection system for a typical 2-storey building (6 air terminals)unit₦729,500₦91,045₦0₦820,545
N14LV aerial bundled cable 3x70+54.6 on 9m concrete poles at 40m spansm₦15,266₦2,391₦1,153₦18,810

Oil & gas

CodeItemUnitMaterialsLabourPlantNet rate
O01Line pipe 8" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trenchm₦109,695₦3,611₦2,644₦115,949
O02Line pipe 12" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trenchm₦182,567₦4,986₦3,571₦191,124
O03Line pipe 24" X52, 3LPE-coated: string, weld (100% RT), field-joint coat, lower-in and tie-in in prepared trenchm₦435,735₦10,562₦10,382₦456,678
O04Pipeline trench excavation 1.0m wide x 1.5m deep by excavator, spoil alongsidem₦0₦344₦4,139₦4,483
O05Backfill pipeline trench with 300mm sand padding and excavated material, compactedm₦2,205₦573₦2,191₦4,969
O06Hydrostatic test, dewatering and drying of 12" pipelinem₦280₦156₦116₦552
O07HDD river/road crossing for 12" X52 3LPE pipeline incl. drilling fluidm₦199,711₦6,018₦186,959₦392,688
O08Magnesium anode 17lb installed with cable and test post shareunit₦171,022₦9,498₦0₦180,520
O09Install 12" ANSI 150 gate valve with 2 weld-neck flanges, gaskets and boltingunit₦6,230,326₦88,425₦187,310₦6,506,061
O10Pipeline marker post set in concreteunit₦46,854₦1,719₦0₦48,573
O11Underground fuel tank 33,000L installed: excavation, sand surround, concrete anchor slabunit₦10,264,648₦108,730₦705,760₦11,079,138
O12Fuel dispenser installed with 6m 2" seamless product line and electricsunit₦12,223,040₦62,061₦0₦12,285,101
O13Fuel station canopy: steel frame, aluminium roof and ACP fasciam²₦92,700₦11,839₦4,620₦109,158
O14Abrasive blast clean to Sa2.5 and apply 3-coat epoxy system to steelworkm²₦27,840₦2,751₦8,281₦38,872
O15Radiographic testing of pipeline weld (service, incl. film)unit₦35,000₦573₦0₦35,573
O16Fabricate and erect steel storage tank shell/bottom/roof, per tonne of platetonne₦1,833,372₦154,252₦549,332₦2,536,956
O17Install 12" pig launcher/receiver incl. tie-in weldsunit₦84,189,000₦256,760₦749,240₦85,195,000

Piling & ground engineering

CodeItemUnitMaterialsLabourPlantNet rate
P01Bored cast-in-place pile 600mm dia in C30/37 concrete incl. rebar cage and drilling fluidm₦103,096₦8,024₦125,491₦236,611
P02Bored cast-in-place pile 900mm dia in C30/37 concrete incl. rebar cage and drilling fluidm₦220,353₦13,018₦199,148₦432,519
P03Bored cast-in-place pile 1200mm dia in C30/37 concrete incl. rebar cage and drilling fluidm₦372,953₦18,012₦291,767₦682,733
P04Precast concrete pile 400x400mm supplied and drivenm₦149,350₦1,441₦22,687₦173,478
P05Steel tubular pile 762x14mm supplied and driven incl. splicesm₦499,259₦2,260₦31,761₦533,280
P06Steel sheet piling PU18, permanent, supplied and driven by vibro hammerm²₦215,408₦835₦10,947₦227,190
P07Temporary sheet piling PU18 driven and extracted (30% material write-off/hire)m²₦62,740₦1,376₦21,893₦86,008
P08Break down pile head 600mm and prepare starter barsunit₦0₦4,667₦27,821₦32,488
P09Pile integrity test (low-strain), per pileunit₦30,000₦0₦0₦30,000
P10Prefabricated vertical drains installed to 15mm₦392₦11.46₦259₦662
P11Gabion box 2x1x1m filled with hand-packed stoneunit₦79,988₦9,416₦13,625₦103,028
P12Reno mattress 0.3m filled with stonem²₦17,331₦2,702₦0₦20,033
P13Biaxial geogrid laid in fillm²₦3,388₦45.85₦0₦3,434
P14HDPE geomembrane 1.5mm laid and welded (lining)m²₦8,154₦226₦38.18₦8,418
P15Soil nail 25mm x 6m, drilled and grouted, with head plateunit₦59,561₦6,386₦43,790₦109,737
P16Ground/rock anchor 32mm bar, drilled and groutedm₦13,043₦1,572₦27,679₦42,294
P17Geosynthetic clay liner laid with overlapsm²₦9,919₦57.31₦0₦9,976
P18Settlement plate installed and initial readingunit₦85,000₦18,668₦0₦103,668
P19Non-woven geotextile 400g/m2 laid as separator/filterm²₦2,662₦34.39₦0₦2,696

Bridges & heavy structures

CodeItemUnitMaterialsLabourPlantNet rate
Q01Post-tensioning: 12x15.2mm tendons supplied, placed, stressed and groutedtonne₦7,318,681₦196,500₦318,990₦7,834,171
Q02Laminated elastomeric bearing supplied and installeddm3₦4,106₦237₦0₦4,343
Q03Pot bearing 2,000kN supplied, installed and groutedunit₦7,150,360₦15,065₦112,386₦7,277,811
Q04Strip-seal expansion joint with C40 nosing and anchorage steelm₦651,369₦7,696₦0₦659,065
Q05Galvanised steel bridge parapet railing installedm₦126,180₦3,504₦0₦129,684
Q06Precast pre-tensioned I-girder (25m class) supplied and erectedm₦650,000₦1,244₦42,099₦693,343
Q07Bridge deck waterproofing membrane on primed deckm²₦12,000₦393₦0₦12,393
Q08C40/50 ready-mix concrete in bridge deck placed by boom pumpm³₦214,200₦6,354₦8,501₦229,055
Q09Aluminium system formwork to slab soffit (1 month hire per use)m²₦4,631₦2,243₦0₦6,875
Q10Epoxy-coated reinforcement cut, bent and fixedtonne₦1,435,140₦91,700₦0₦1,526,840
Q11Deck drainage scupper installedunit₦85,000₦7,205₦0₦92,205
Q12Heavy-duty shoring tower, per tower per month incl. erect and dismantleunit₦35,000₦13,755₦0₦48,755
Q13Modular expansion joint installed with nosing concrete and anchoragem₦2,751,559₦18,340₦37,462₦2,807,361

Roads & external

CodeItemUnitMaterialsLabourPlantNet rate
G0160mm interlocking paving on 50mm sand bed, compactedm²₦9,534₦1,433₦202₦11,169
G0280mm interlocking paving on 50mm sand bed, compactedm²₦11,634₦1,554₦202₦13,390
R01Scarify, water & compact subgrade to 95% MDDm²₦0₦22.93₦554₦577
R02Laterite sub-base, spread & compacted in layers (compacted volume)m³₦9,896₦229₦3,502₦13,628
R03Crushed stone base course, compacted (compacted volume)m³₦30,608₦287₦3,748₦34,642
R04Prime coat MC-30 at 1.0 L/m2m²₦1,522₦11.46₦119₦1,653
R05Tack coat (emulsion) at 0.3 L/m2m²₦346₦5.73₦67.59₦420
R06Asphalt wearing course 50mm, laid & compactedm²₦19,364₦58.95₦1,058₦20,481
R07Asphalt binder course 60mm, laid & compactedm²₦22,075₦58.95₦1,157₦23,291
R08Precast road kerb 900x300x150 on concrete bed & haunchm₦15,738₦1,670₦0₦17,408
R09Precast 600mm U-drain with cover, laid on concrete bedm₦59,561₦2,374₦5,767₦67,702
R10In-situ RC drain 600x600 internal, 150mm walls & base, incl. excavation, formwork & rebarm₦80,967₦19,306₦1,898₦102,171
R11900mm precast culvert pipe laid with 1:3:6 surroundm₦187,443₦5,895₦20,696₦214,035
R12Thermoplastic road marking, 100mm linem₦662₦11.46₦38.18₦711
R13Chain-link fence 1.8m on angle posts @3m with 3 lines barbed wirem₦10,925₦1,818₦0₦12,743
R14225mm block fence wall 2.4m high incl. foundation, piers, plaster both sides & razor wirem₦65,446₦17,710₦0₦83,156
R16Carpet grass laid on 100mm topsoil, wateredm²₦2,422₦368₦0₦2,790
R17Cement-stabilised base 150mm (5% cement) mixed in place and compactedm²₦5,181₦34.39₦1,442₦6,657
R18Double surface dressing with emulsion and 10/14mm chippingsm²₦3,620₦22.93₦275₦3,918
R19Jointed concrete pavement C35/45 250mm with dowels, tie bars and sealed jointsm²₦54,524₦477₦5,338₦60,339
R20Asphalt base course 60mm laid and compactedm²₦21,058₦58.95₦1,157₦22,274
R21HDPE twin-wall culvert 600mm laid on and surrounded with sandm₦59,590₦2,636₦9,084₦71,310
R22Precast box culvert 2x2m laid on blindingm₦638,250₦8,515₦151,614₦798,379
R23Precast concrete safety barrier installedm₦96,900₦458₦7,689₦105,047
R24Solar street light 60W on 6m pole with concrete baseunit₦437,360₦13,673₦23,066₦474,100
R25Traffic signal installation, 4-way junctionset₦23,370,760₦100,215₦230,665₦23,701,640
R26Retro-reflective road sign on galvanised post with concrete basem²₦131,380₦4,912₦0₦136,292
R27Cold mill existing asphalt 50mm and removem²₦0₦11.46₦1,980₦1,992
R28Rubber speed hump installedm₦39,480₦573₦0₦40,053
R29Road marking with paint, 100mm linem₦179₦22.93₦31.79₦233
R30Gabion retaining wall (2x1x1 boxes) incl. geotextile backingm³₦54,842₦9,416₦13,625₦77,882

Steelwork

CodeItemUnitMaterialsLabourPlantNet rate
S01Structural steel UB/UC frame, fabricated, primed & erectedtonne₦1,595,190₦221,062₦711,612₦2,527,864
S02Light steel roof trusses (angle/SHS), fabricated, primed & erectedtonne₦1,603,500₦178,488₦649,120₦2,431,108
S03Galvanised Z-purlin 150mm fixed to trussesm₦8,941₦606₦0₦9,547
S04Steel handrail/balustrade 1m high, 2" pipe & 25mm SHS, paintedm₦26,250₦9,334₦0₦35,583
S05Wrought-iron burglary-proof to windows, supply & fixm²₦35,000₦229₦0₦35,229

Water & sewerage

CodeItemUnitMaterialsLabourPlantNet rate
V01HDPE PE100 SDR17 pipe 110mm laid and butt-fused in trench on sand bedm₦9,466₦678₦343₦10,487
V02HDPE PE100 SDR17 pipe 160mm laid and butt-fused in trench on sand bedm₦19,596₦904₦458₦20,958
V03HDPE PE100 SDR17 pipe 250mm laid and butt-fused in trench on sand bedm₦47,150₦1,384₦2,049₦50,583
V04HDPE PE100 SDR17 pipe 400mm laid and butt-fused in trench on sand bedm₦119,536₦2,145₦3,095₦124,777
V05Ductile iron pipe DN150 laid in trench on sand bedm₦52,905₦1,244₦1,816₦55,966
V06Ductile iron pipe DN300 laid in trench on sand bedm₦119,713₦2,121₦3,028₦124,862
V07uPVC sewer pipe 200mm laid on granular bedm₦15,811₦1,146₦0₦16,957
V08DI gate valve DN150 installed in block chamber with coverunit₦812,681₦30,130₦0₦842,811
V09Pillar fire hydrant with isolating valve installedunit₦1,710,602₦23,580₦0₦1,734,182
V10Bulk water meter DN100 with 2 valves in chamberunit₦2,771,484₦46,014₦0₦2,817,498
V11Domestic water connection 15mm with meter and stopcockunit₦59,820₦11,790₦0₦71,610
V12Precast manhole 1200mm dia, 2m deep, with D400 coverunit₦601,528₦28,492₦224,332₦854,353
V13Two-chamber septic tank (10m3) in solid blockwork with RC cover, and soakawayunit₦1,830,704₦252,830₦272,500₦2,356,034
V14GRP sectional water tank on steel base frame, installedm³₦373,978₦8,253₦0₦382,232
V15Package sewage treatment plant 50m3/day installed on concrete baseunit₦91,585,500₦252,830₦749,240₦92,587,570
V16Submersible pump 5.5HP installed in borehole with riser and cableunit₦1,465,400₦49,616₦0₦1,515,016
V17Rapid gravity filter media (graded sand) placedm³₦58,800₦2,292₦0₦61,093
V18Butterfly valve DN300 installedunit₦1,213,030₦23,580₦92,266₦1,328,876

Waterproofing

CodeItemUnitMaterialsLabourPlantNet rate
W014mm torch-on bitumen membrane on primed concrete slabm²₦6,418₦1,146₦0₦7,564
W02Cementitious waterproofing, 2 coats, to wet areas/tanksm²₦7,219₦655₦0₦7,874
W032 coats bituminous paint to substructure wallsm²₦1,444₦172₦0₦1,616
W04Polyurethane liquid membrane to roof/balconym²₦14,175₦786₦0₦14,961

Fire, HVAC, lifts & ICT

CodeItemUnitMaterialsLabourPlantNet rate
X01Addressable smoke detection point with 15m FP cable in conduitpoint₦116,729₦6,878₦0₦123,606
X02Addressable fire alarm panel 2-loop installed and commissionedunit₦6,531,700₦65,500₦0₦6,597,200
X03Manual call point with 15m FP cable in conduitunit₦107,398₦4,912₦0₦112,310
X04Sounder-beacon with 15m FP cable in conduitunit₦116,729₦4,912₦0₦121,642
X05Sprinkler head with 3m 1" galvanised branch pipe and hangersunit₦27,621₦5,649₦0₦33,270
X06Fire hose reel cabinet installed with 12m 1" supplyunit₦507,240₦13,428₦0₦520,667
X07Dry powder extinguisher 9kg wall-mounted with signunit₦54,000₦344₦0₦54,344
X08Fire pump set 500gpm installed on base and commissionedset₦71,499,996₦229,905₦374,620₦72,104,521
X09VRF air-conditioning per HP installed (outdoor, cassette share, piping, refrigerant)HP₦2,149,508₦15,392₦0₦2,164,900
X10Ceiling cassette split AC 3HP installed with 6m pipingunit₦1,890,950₦29,639₦0₦1,920,589
X11Galvanised ductwork with insulation installedm²₦31,955₦3,537₦0₦35,492
X12Ceiling diffuser installed and balancedunit₦45,000₦3,275₦0₦48,275
X13Passenger lift 8-person 5 stops incl. builder's attendanceunit₦85,894,640₦45,850₦0₦85,940,490
X14Escalator 4.5m rise incl. builder's attendance and liftingunit₦177,289,000₦68,775₦1,322,660₦178,680,435
X15Cat6 data point (avg 30m) with outlet and patch panel sharepoint₦25,367₦5,404₦0₦30,770
X16IP CCTV camera installed with 25m Cat6 and NVR shareunit₦106,180₦7,205₦0₦113,384
X17Access-controlled door (reader, maglock, exit button)unit₦354,988₦27,182₦0₦382,170
X18Solar water heater 200L installed and connectedunit₦867,325₦26,855₦0₦894,180
X19Air-cooled chiller per TR installedTR₦1,399,650₦15,392₦8,818₦1,423,861
X20Goods lift 1000kg 3 stops incl. builder's attendanceunit₦97,042,400₦45,850₦0₦97,088,250

Industrial buildings

CodeItemUnitMaterialsLabourPlantNet rate
Y01PU sandwich roof panel 50mm fixed to purlins incl. flashingsm²₦37,212₦1,015₦1,090₦39,318
Y02PU sandwich wall panel 50mm fixed to railsm²₦32,687₦1,146₦1,246₦35,079
Y03Galvanised rolling shutter (manual) installedm²₦55,000₦3,275₦0₦58,275
Y04Insulated sectional door 4x4m motorised, installedunit₦7,091,560₦44,868₦0₦7,136,428
Y05Overhead crane 10t x 20m span installed incl. 80m crane railunit₦124,602,442₦426,405₦2,645,320₦127,674,167
Y06Dry-shake floor hardener (5kg/m2) power-floated into slabm²₦6,300₦295₦129₦6,724
Y07Cold-room PU panel 100mm installedm²₦113,162₦2,030₦0₦115,192
Y08Pre-engineered steel building frame (approx. 35kg/m2), primed and erectedm²₦54,989₦5,895₦4,295₦65,179
Y09Hydraulic dock leveller installed in pitunit₦10,516,550₦44,868₦0₦10,561,418

Site, testing & surveys

CodeItemUnitMaterialsLabourPlantNet rate
Z01Concrete cube test, set of 3 incl. samplingset₦15,000₦573₦0₦15,573
Z02Geotechnical borehole with SPT (service)m₦35,000₦0₦0₦35,000
Z03Cone penetration test (service)m₦18,000₦0₦0₦18,000
Z04Plate load test incl. reaction loadunit₦450,000₦0₦272,500₦722,500
Z05Static pile load test up to 300t incl. attendanceunit₦8,500,000₦27,510₦1,498,480₦10,025,990
Z06High-strain dynamic pile test (PDA)unit₦650,000₦0₦0₦650,000
Z07Topographic survey with total station (in-house)ha₦0₦12,071₦7,500₦19,571
Z08Setting out with surveyor and 2 chainmenday₦0₦40,237₦25,000₦65,237
Z09Site hoarding 2.4m, corrugated sheets on timber posts, paintedm₦17,361₦3,930₦0₦21,291
Z10Field density test (sand replacement)unit₦15,000₦0₦0₦15,000
Z11CBR testunit₦30,000₦0₦0₦30,000
Z12Rebar tensile and bend testunit₦25,000₦0₦0₦25,000
Z13Ultrasonic weld test, per jointunit₦20,000₦0₦0₦20,000
Z14Asphalt core and extraction testunit₦40,000₦0₦0₦40,000
Z15Water quality analysis (full suite)unit₦85,000₦0₦0₦85,000

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/, prices as at 15 October 2026.