Hardcore bed 150mm thick, blinded with stone dust, compacted: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦4,123per m²

Tender rate about ₦5,504 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hardcore bed 150mm thick, blinded with stone dust, compacted is ₦4,123 per m² in Abuja: ₦3,308 materials, ₦573 labour and ₦243 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦5,504 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHardcore / stone base, per tonne0.27 tonne5%₦11,000₦3,119
MaterialStone dust, per tonne0.02 tonne5%₦9,000₦189
Labour (hours)Unskilled labourer0.5 h-₦1,146₦573
Plant (days)Plate compactor (petrol)0.01 day-₦24,273₦243
Materials₦3,308
Labour₦573
Plant₦243
Net unit rate per m²₦4,123

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦4,123₦5,504
Lagos₦4,380₦5,846
Port Harcourt₦4,379₦5,844
Ibadan₦3,831₦5,114
Osogbo (Osun)₦3,840₦5,126
Kano₦3,736₦4,987
Kaduna₦3,787₦5,054
Enugu₦3,938₦5,256
Benin City₦3,987₦5,322
Uyo₦4,144₦5,531
Jos₦3,825₦5,105
Riverine / creek site₦5,270₦7,034

Related earthworks rates

Frequently asked questions

How much does hardcore bed 150mm thick, blinded with stone dust, compacted cost per m² in Nigeria?

About ₦4,123 per m² net in Abuja as at 15 October 2026, or about ₦5,504 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦4,380 per m² and the tender rate about ₦5,846 per m².

What does the rate include?

Materials (Hardcore / stone base, Stone dust) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Plate compactor (petrol)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/a06-hardcore-bed-150mm-thick-blinded-with-stone-dust-compact/, prices as at 15 October 2026.