Load and cart away surplus spoil to tip n.e. 10km: cost per m³ in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦8,418per m³

Tender rate about ₦11,236 per m³ with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for load and cart away surplus spoil to tip n.e. 10km is ₦8,418 per m³ in Abuja: ₦0 materials, ₦57.31 labour and ₦8,361 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦11,236 per m³.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Wheel loader 3t (SDLG class)0.002857 day-₦458,450₦1,310
Plant (days)Tipper truck 20t0.01667 day-₦423,040₦7,051
Labour (hours)Unskilled labourer0.05 h-₦1,146₦57.31
Materials₦0
Labour₦57.31
Plant₦8,361
Net unit rate per m³₦8,418

Scope note: Excl. tipping fees.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m³Tender rate incl. OH&P and VAT
Abuja (FCT)₦8,418₦11,236
Lagos₦8,841₦11,800
Port Harcourt₦9,084₦12,125
Ibadan₦7,988₦10,663
Osogbo (Osun)₦8,153₦10,882
Kano₦7,986₦10,659
Kaduna₦7,987₦10,661
Enugu₦8,239₦10,997
Benin City₦8,408₦11,222
Uyo₦8,660₦11,559
Jos₦8,154₦10,884
Riverine / creek site₦11,768₦15,707

Related earthworks rates

Frequently asked questions

How much does load and cart away surplus spoil to tip n.e. 10km cost per m³ in Nigeria?

About ₦8,418 per m³ net in Abuja as at 15 October 2026, or about ₦11,236 per m³ as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦8,841 per m³ and the tender rate about ₦11,800 per m³.

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Tipper truck 20t, Wheel loader 3t (SDLG class)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Excl. tipping fees.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/a15-load-and-cart-away-surplus-spoil-to-tip-n-e-10km/, prices as at 15 October 2026.