Level and compact bottom of excavation / formation: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦196per m²

Tender rate about ₦261 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for level and compact bottom of excavation / formation is ₦196 per m² in Abuja: ₦0 materials, ₦115 labour and ₦80.90 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦261 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Labour (hours)Unskilled labourer0.1 h-₦1,146₦115
Plant (days)Plate compactor (petrol)0.003333 day-₦24,273₦80.90
Materials₦0
Labour₦115
Plant₦80.90
Net unit rate per m²₦196

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦196₦261
Lagos₦209₦279
Port Harcourt₦196₦262
Ibadan₦169₦225
Osogbo (Osun)₦164₦219
Kano₦163₦217
Kaduna₦166₦222
Enugu₦171₦228
Benin City₦175₦233
Uyo₦181₦241
Jos₦168₦224
Riverine / creek site₦239₦319

Related earthworks rates

Frequently asked questions

How much does level and compact bottom of excavation / formation cost per m² in Nigeria?

About ₦196 per m² net in Abuja as at 15 October 2026, or about ₦261 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦209 per m² and the tender rate about ₦279 per m².

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Plate compactor (petrol)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/a12-level-and-compact-bottom-of-excavation-formation/, prices as at 15 October 2026.