BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Clear site of bush and shrubs, remove arisings: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦172per m²

Tender rate about ₦229 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for clear site of bush and shrubs, remove arisings is ₦172 per m² in Abuja: ₦0 materials, ₦172 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦229 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Labour (hours)Unskilled labourer0.15 h-₦1,146₦172
Materials₦0
Labour₦172
Plant₦0
Net unit rate per m²₦172

Scope note: Excl. felling trees >600mm girth.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦172₦229
Lagos₦186₦248
Port Harcourt₦163₦218
Ibadan₦138₦184
Osogbo (Osun)₦129₦172
Kano₦129₦172
Kaduna₦134₦179
Enugu₦138₦184
Benin City₦141₦188
Uyo₦146₦195
Jos₦134₦179
Riverine / creek site₦189₦252

Related earthworks rates

Frequently asked questions

How much does clear site of bush and shrubs, remove arisings cost per m² in Nigeria?

About ₦172 per m² net in Abuja as at 15 October 2026, or about ₦229 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦186 per m² and the tender rate about ₦248 per m².

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Excl. felling trees >600mm girth.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/a01-clear-site-of-bush-and-shrubs-remove-arisings/, prices as at 15 October 2026.