Ductile iron pipe DN300 laid in trench on sand bed: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦124,862per m

Tender rate about ₦166,659 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for ductile iron pipe DN300 laid in trench on sand bed is ₦124,862 per m in Abuja: ₦119,713 materials, ₦2,121 labour and ₦3,028 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦166,659 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialDuctile iron pipe DN300 K9 push-fit (58 kg/m), per m1.02 m2%₦113,652₦118,243
MaterialFilling sand, per tonne0.4 tonne5%₦3,500₦1,470
Plant (days)Hydraulic excavator 14t0.005556 day-₦545,000₦3,028
Labour (hours)Plumber0.35 h-₦2,784₦974
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦119,713
Labour₦2,121
Plant₦3,028
Net unit rate per m₦124,862

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦124,862₦166,659
Lagos₦132,366₦176,674
Port Harcourt₦134,575₦179,623
Ibadan₦118,301₦157,901
Osogbo (Osun)₦119,452₦159,438
Kano₦115,800₦154,564
Kaduna₦117,061₦156,247
Enugu₦121,983₦162,816
Benin City₦123,283₦164,551
Uyo₦128,226₦171,149
Jos₦118,319₦157,925
Riverine / creek site₦162,199₦216,494

Related water & sewerage rates

Frequently asked questions

How much does ductile iron pipe DN300 laid in trench on sand bed cost per m in Nigeria?

About ₦124,862 per m net in Abuja as at 15 October 2026, or about ₦166,659 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦132,366 per m and the tender rate about ₦176,674 per m.

What does the rate include?

Materials (Ductile iron pipe DN300 K9 push-fit (58 kg/m), Filling sand) with waste allowances; labour (Plumber, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Hydraulic excavator 14t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/v06-ductile-iron-pipe-dn300-laid-in-trench-on-sand-bed/, prices as at 15 October 2026.