HDPE PE100 SDR17 pipe 160mm laid and butt-fused in trench on sand bed: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦20,958per m

Tender rate about ₦27,973 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hDPE PE100 SDR17 pipe 160mm laid and butt-fused in trench on sand bed is ₦20,958 per m in Abuja: ₦19,596 materials, ₦904 labour and ₦458 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦27,973 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHDPE PE100 SDR17 (PN10) pipe 160mm (4.27 kg/m), per m1.02 m3%₦17,953₦18,861
MaterialFilling sand, per tonne0.2 tonne5%₦3,500₦735
Plant (days)Generator 20kVA (diesel)0.003333 day-₦137,280₦458
Labour (hours)Plumber0.16 h-₦2,784₦445
Labour (hours)Unskilled labourer0.4 h-₦1,146₦458
Materials₦19,596
Labour₦904
Plant₦458
Net unit rate per m₦20,958

Scope note: Trench excavation excluded.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦20,958₦27,973
Lagos₦22,229₦29,670
Port Harcourt₦22,517₦30,054
Ibadan₦19,774₦26,394
Osogbo (Osun)₦19,934₦26,607
Kano₦19,337₦25,810
Kaduna₦19,560₦26,108
Enugu₦20,376₦27,197
Benin City₦20,599₦27,494
Uyo₦21,424₦28,595
Jos₦19,765₦26,382
Riverine / creek site₦27,110₦36,185

Related water & sewerage rates

Frequently asked questions

How much does hDPE PE100 SDR17 pipe 160mm laid and butt-fused in trench on sand bed cost per m in Nigeria?

About ₦20,958 per m net in Abuja as at 15 October 2026, or about ₦27,973 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦22,229 per m and the tender rate about ₦29,670 per m.

What does the rate include?

Materials (Filling sand, HDPE PE100 SDR17 (PN10) pipe 160mm (4.27 kg/m)) with waste allowances; labour (Plumber, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Generator 20kVA (diesel)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Trench excavation excluded.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/v02-hdpe-pe100-sdr17-pipe-160mm-laid-and-butt-fused-in-trenc/, prices as at 15 October 2026.