HDPE PE100 SDR17 pipe 250mm laid and butt-fused in trench on sand bed: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦50,583per m

Tender rate about ₦67,515 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hDPE PE100 SDR17 pipe 250mm laid and butt-fused in trench on sand bed is ₦50,583 per m in Abuja: ₦47,150 materials, ₦1,384 labour and ₦2,049 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦67,515 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHDPE PE100 SDR17 (PN10) pipe 250mm (10.44 kg/m), per m1.02 m3%₦43,830₦46,048
MaterialFilling sand, per tonne0.3 tonne5%₦3,500₦1,102
Plant (days)Generator 20kVA (diesel)0.005 day-₦137,280₦686
Labour (hours)Plumber0.25 h-₦2,784₦696
Labour (hours)Unskilled labourer0.6 h-₦1,146₦688
Plant (days)Hydraulic excavator 14t0.0025 day-₦545,000₦1,362
Materials₦47,150
Labour₦1,384
Plant₦2,049
Net unit rate per m₦50,583

Scope note: Trench excavation excluded.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦50,583₦67,515
Lagos₦53,625₦71,576
Port Harcourt₦54,450₦72,677
Ibadan₦47,846₦63,863
Osogbo (Osun)₦48,290₦64,454
Kano₦46,834₦62,512
Kaduna₦47,347₦63,196
Enugu₦49,322₦65,833
Benin City₦49,862₦66,554
Uyo₦51,851₦69,209
Jos₦47,860₦63,880
Riverine / creek site₦65,686₦87,674

Related water & sewerage rates

Frequently asked questions

How much does hDPE PE100 SDR17 pipe 250mm laid and butt-fused in trench on sand bed cost per m in Nigeria?

About ₦50,583 per m net in Abuja as at 15 October 2026, or about ₦67,515 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦53,625 per m and the tender rate about ₦71,576 per m.

What does the rate include?

Materials (Filling sand, HDPE PE100 SDR17 (PN10) pipe 250mm (10.44 kg/m)) with waste allowances; labour (Plumber, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Generator 20kVA (diesel), Hydraulic excavator 14t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Trench excavation excluded.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/v03-hdpe-pe100-sdr17-pipe-250mm-laid-and-butt-fused-in-trenc/, prices as at 15 October 2026.