Formwork to slab using steel props (props hired): cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦10,545per m²

Tender rate about ₦14,075 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for formwork to slab using steel props (props hired) is ₦10,545 per m² in Abuja: ₦3,958 materials, ₦4,487 labour and ₦2,100 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦14,075 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialMarine board 18mm, 4'x8' film-faced0.07 sheet5%₦32,000₦2,352
Material2"x4"x12' hardwood (Gmelina/Akpontu)0.25 length10%₦4,800₦1,320
MaterialWire nails, assorted, per kg0.1 kg10%₦2,600₦286
Plant (days)Adjustable steel props, per 100 nr0.14 day-₦15,000₦2,100
Labour (hours)Carpenter (formwork & roof)1.2 h-₦2,784₦3,340
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦3,958
Labour₦4,487
Plant₦2,100
Net unit rate per m²₦10,545

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦10,545₦14,075
Lagos₦11,246₦15,011
Port Harcourt₦10,805₦14,422
Ibadan₦9,344₦12,473
Osogbo (Osun)₦9,202₦12,282
Kano₦9,041₦12,067
Kaduna₦9,215₦12,300
Enugu₦9,526₦12,715
Benin City₦9,698₦12,944
Uyo₦10,053₦13,419
Jos₦9,297₦12,409
Riverine / creek site₦13,021₦17,380

Related concrete rates

Frequently asked questions

How much does formwork to slab using steel props (props hired) cost per m² in Nigeria?

About ₦10,545 per m² net in Abuja as at 15 October 2026, or about ₦14,075 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦11,246 per m² and the tender rate about ₦15,011 per m².

What does the rate include?

Materials (2"x4"x12' hardwood (Gmelina/Akpontu), Marine board 18mm, Wire nails) with waste allowances; labour (Carpenter (formwork & roof), Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Adjustable steel props, per 100 nr) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/b19-formwork-to-slab-using-steel-props-props-hired/, prices as at 15 October 2026.