BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Precast lintel 150x225x1500, supply and bed in mortar: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦19,688per unit

Tender rate about ₦26,278 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for precast lintel 150x225x1500, supply and bed in mortar is ₦19,688 per unit in Abuja: ₦18,607 materials, ₦1,081 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦26,278 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialPrecast lintel 150x225x15001 unit2%₦18,000₦18,360
MaterialOPC 42.5 cement, 50kg bag - adopted market average0.02 bag3%₦12,000₦247
Labour (hours)Mason / bricklayer0.3 h-₦2,456₦737
Labour (hours)Unskilled labourer0.3 h-₦1,146₦344
Materials₦18,607
Labour₦1,081
Plant₦0
Net unit rate per unit₦19,688

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦19,688₦26,278
Lagos₦20,891₦27,884
Port Harcourt₦21,122₦28,193
Ibadan₦18,541₦24,748
Osogbo (Osun)₦18,673₦24,924
Kano₦18,115₦24,179
Kaduna₦18,334₦24,471
Enugu₦19,100₦25,493
Benin City₦19,307₦25,770
Uyo₦20,084₦26,807
Jos₦18,520₦24,719
Riverine / creek site₦25,378₦33,873

Related concrete rates

Frequently asked questions

How much does precast lintel 150x225x1500, supply and bed in mortar cost per unit in Nigeria?

About ₦19,688 per unit net in Abuja as at 15 October 2026, or about ₦26,278 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦20,891 per unit and the tender rate about ₦27,884 per unit.

What does the rate include?

Materials (OPC 42.5 cement, Precast lintel 150x225x1500) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/b17-precast-lintel-150x225x1500-supply-and-bed-in-mortar/, prices as at 15 October 2026.