Ready-mix C35/45 placed by boom pump in raft/transfer slab: cost per m³ in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦204,739per m³

Tender rate about ₦273,275 per m³ with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for ready-mix C35/45 placed by boom pump in raft/transfer slab is ₦204,739 per m³ in Abuja: ₦195,840 materials, ₦3,766 labour and ₦5,133 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦273,275 per m³.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialReady-mix C35/45, delivered Abuja (ex-pump)1 m³2%₦192,000₦195,840
Plant (days)Concrete boom pump 37m0.003333 day-₦1,441,300₦4,804
Plant (days)Poker vibrator (petrol)0.01667 day-₦19,728₦329
Labour (hours)Mason / bricklayer0.6 h-₦2,456₦1,474
Labour (hours)Unskilled labourer2 h-₦1,146₦2,292
Materials₦195,840
Labour₦3,766
Plant₦5,133
Net unit rate per m³₦204,739

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m³Tender rate incl. OH&P and VAT
Abuja (FCT)₦204,739₦273,275
Lagos₦217,047₦289,703
Port Harcourt₦220,628₦294,483
Ibadan₦193,937₦258,857
Osogbo (Osun)₦195,810₦261,356
Kano₦189,832₦253,378
Kaduna₦191,903₦256,142
Enugu₦199,966₦266,904
Benin City₦202,103₦269,756
Uyo₦210,203₦280,568
Jos₦193,964₦258,893
Riverine / creek site₦265,921₦354,937

Related concrete rates

Frequently asked questions

How much does ready-mix C35/45 placed by boom pump in raft/transfer slab cost per m³ in Nigeria?

About ₦204,739 per m³ net in Abuja as at 15 October 2026, or about ₦273,275 per m³ as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦217,047 per m³ and the tender rate about ₦289,703 per m³.

What does the rate include?

Materials (Ready-mix C35/45) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Concrete boom pump 37m, Poker vibrator (petrol)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/b18-ready-mix-c35-45-placed-by-boom-pump-in-raft-transfer-sl/, prices as at 15 October 2026.