Prices as at 15 October 2026, checked weekly. Base location Abuja.

Ready-mix C30/37 placed by pump in columns & walls: cost per m³ in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦198,104per m³

Tender rate about ₦264,418 per m³ with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for ready-mix C30/37 placed by pump in columns & walls is ₦198,104 per m³ in Abuja: ₦191,060 materials, ₦6,386 labour and ₦658 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦264,418 per m³.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialReady-mix C30/37, delivered Abuja (ex-pump)1 m³2%₦178,000₦181,560
MaterialConcrete pump hire, per pour (<=60 m3)0.025 pour-₦380,000₦9,500
Plant (days)Poker vibrator (petrol)0.03333 day-₦19,728₦658
Labour (hours)Mason / bricklayer1.2 h-₦2,456₦2,948
Labour (hours)Unskilled labourer3 h-₦1,146₦3,439
Materials₦191,060
Labour₦6,386
Plant₦658
Net unit rate per m³₦198,104

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m³Tender rate incl. OH&P and VAT
Abuja (FCT)₦198,104₦264,418
Lagos₦210,111₦280,445
Port Harcourt₦213,122₦284,464
Ibadan₦187,241₦249,919
Osogbo (Osun)₦188,845₦252,060
Kano₦183,100₦244,392
Kaduna₦185,202₦247,198
Enugu₦192,992₦257,596
Benin City₦195,044₦260,334
Uyo₦202,897₦270,817
Jos₦187,126₦249,766
Riverine / creek site₦256,323₦342,127

Related concrete rates

Frequently asked questions

How much does ready-mix C30/37 placed by pump in columns & walls cost per m³ in Nigeria?

About ₦198,104 per m³ net in Abuja as at 15 October 2026, or about ₦264,418 per m³ as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦210,111 per m³ and the tender rate about ₦280,445 per m³.

What does the rate include?

Materials (Concrete pump hire, Ready-mix C30/37) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Poker vibrator (petrol)) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.