HPL toilet cubicle partition installed: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦669,978per unit

Tender rate about ₦894,250 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hPL toilet cubicle partition installed is ₦669,978 per unit in Abuja: ₦650,000 materials, ₦19,978 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦894,250 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHPL toilet cubicle partition with door & hardware1 unit-₦650,000₦650,000
Labour (hours)Joiner / cabinet maker6 h-₦2,948₦17,685
Labour (hours)Unskilled labourer2 h-₦1,146₦2,292
Materials₦650,000
Labour₦19,978
Plant₦0
Net unit rate per unit₦669,978

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦669,978₦894,250
Lagos₦710,576₦948,439
Port Harcourt₦720,979₦962,324
Ibadan₦633,482₦845,538
Osogbo (Osun)₦638,983₦852,881
Kano₦619,483₦826,853
Kaduna₦626,582₦836,329
Enugu₦652,982₦871,566
Benin City₦659,882₦880,775
Uyo₦686,481₦916,278
Jos₦633,082₦845,005
Riverine / creek site₦866,975₦1,157,193

Related finishes rates

Frequently asked questions

How much does hPL toilet cubicle partition installed cost per unit in Nigeria?

About ₦669,978 per unit net in Abuja as at 15 October 2026, or about ₦894,250 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦710,576 per unit and the tender rate about ₦948,439 per unit.

What does the rate include?

Materials (HPL toilet cubicle partition with door & hardware) with waste allowances; labour (Joiner / cabinet maker, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.