BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Sealer + skim + 3 coats silk emulsion to internal walls: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦3,162per m²

Tender rate about ₦4,221 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for sealer + skim + 3 coats silk emulsion to internal walls is ₦3,162 per m² in Abuja: ₦2,286 materials, ₦876 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦4,221 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialPrimer/sealer, per litre0.1 litre5%₦1,900₦200
MaterialWall putty / skim coat, 20kg0.1 bag5%₦9,000₦945
MaterialSilk emulsion, per litre0.25 litre5%₦4,350₦1,142
Labour (hours)Painter0.4 h-₦2,047₦819
Labour (hours)Unskilled labourer0.05 h-₦1,146₦57.31
Materials₦2,286
Labour₦876
Plant₦0
Net unit rate per m²₦3,162

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦3,162₦4,221
Lagos₦3,370₦4,498
Port Harcourt₦3,302₦4,407
Ibadan₦2,873₦3,835
Osogbo (Osun)₦2,852₦3,807
Kano₦2,783₦3,715
Kaduna₦2,833₦3,781
Enugu₦2,941₦3,926
Benin City₦2,982₦3,980
Uyo₦3,100₦4,137
Jos₦2,855₦3,811
Riverine / creek site₦3,936₦5,254

Related finishes rates

Frequently asked questions

How much does sealer + skim + 3 coats silk emulsion to internal walls cost per m² in Nigeria?

About ₦3,162 per m² net in Abuja as at 15 October 2026, or about ₦4,221 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦3,370 per m² and the tender rate about ₦4,498 per m².

What does the rate include?

Materials (Primer/sealer, Silk emulsion, Wall putty / skim coat) with waste allowances; labour (Painter, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/e16-sealer-skim-3-coats-silk-emulsion-to-internal-walls/, prices as at 15 October 2026.