BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Pipeline marker post set in concrete: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦48,573per unit

Tender rate about ₦64,833 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for pipeline marker post set in concrete is ₦48,573 per unit in Abuja: ₦46,854 materials, ₦1,719 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦64,833 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialPipeline marker post (steel, painted, with plate)1 unit-₦45,000₦45,000
MaterialOPC 42.5 cement, 50kg bag - adopted market average0.15 bag3%₦12,000₦1,854
Labour (hours)Unskilled labourer1.5 h-₦1,146₦1,719
Materials₦46,854
Labour₦1,719
Plant₦0
Net unit rate per unit₦48,573

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦48,573₦64,833
Lagos₦51,522₦68,769
Port Harcourt₦52,236₦69,721
Ibadan₦45,887₦61,247
Osogbo (Osun)₦46,269₦61,758
Kano₦44,864₦59,882
Kaduna₦45,384₦60,576
Enugu₦47,292₦63,123
Benin City₦47,795₦63,795
Uyo₦49,721₦66,365
Jos₦45,852₦61,201
Riverine / creek site₦62,802₦83,824

Related oil & gas rates

Frequently asked questions

How much does pipeline marker post set in concrete cost per unit in Nigeria?

About ₦48,573 per unit net in Abuja as at 15 October 2026, or about ₦64,833 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦51,522 per unit and the tender rate about ₦68,769 per unit.

What does the rate include?

Materials (OPC 42.5 cement, Pipeline marker post (steel) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/o10-pipeline-marker-post-set-in-concrete/, prices as at 15 October 2026.