Core rock 1-500kg placed and trimmed: cost per tonne in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦25,294per tonne

Tender rate about ₦33,762 per tonne with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for core rock 1-500kg placed and trimmed is ₦25,294 per tonne in Abuja: ₦22,660 materials, ₦34.39 labour and ₦2,600 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦33,762 per tonne.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialCore rock / quarry run 1-500kg, delivered, per tonne1 tonne3%₦22,000₦22,660
Plant (days)Hydraulic excavator 30t0.001667 day-₦1,141,840₦1,903
Plant (days)Bulldozer D7 class0.000667 day-₦1,044,460₦697
Labour (hours)Unskilled labourer0.03 h-₦1,146₦34.39
Materials₦22,660
Labour₦34.39
Plant₦2,600
Net unit rate per tonne₦25,294

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per tonneTender rate incl. OH&P and VAT
Abuja (FCT)₦25,294₦33,762
Lagos₦26,787₦35,754
Port Harcourt₦27,314₦36,457
Ibadan₦24,025₦32,067
Osogbo (Osun)₦24,301₦32,436
Kano₦23,570₦31,460
Kaduna₦23,797₦31,763
Enugu₦24,782₦33,078
Benin City₦25,062₦33,451
Uyo₦26,047₦34,766
Jos₦24,076₦32,135
Riverine / creek site₦33,136₦44,228

Related marine & dredging rates

Frequently asked questions

How much does core rock 1-500kg placed and trimmed cost per tonne in Nigeria?

About ₦25,294 per tonne net in Abuja as at 15 October 2026, or about ₦33,762 per tonne as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦26,787 per tonne and the tender rate about ₦35,754 per tonne.

What does the rate include?

Materials (Core rock / quarry run 1-500kg) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Bulldozer D7 class, Hydraulic excavator 30t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/k06-core-rock-1-500kg-placed-and-trimmed/, prices as at 15 October 2026.