BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Bathymetric survey with survey boat: cost per km in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦42,074per km

Tender rate about ₦56,158 per km with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for bathymetric survey with survey boat is ₦42,074 per km in Abuja: ₦0 materials, ₦2,604 labour and ₦39,470 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦56,158 per km.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Hydrographic survey boat with echo sounder & GNSS0.08333 day-₦473,640₦39,470
Labour (hours)Land surveyor0.7 h-₦2,410₦1,687
Labour (hours)Chainman / survey assistant0.7 h-₦1,310₦917
Materials₦0
Labour₦2,604
Plant₦39,470
Net unit rate per km₦42,074

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per kmTender rate incl. OH&P and VAT
Abuja (FCT)₦42,074₦56,158
Lagos₦44,255₦59,070
Port Harcourt₦45,101₦60,198
Ibadan₦39,579₦52,828
Osogbo (Osun)₦40,239₦53,708
Kano₦39,449₦52,655
Kaduna₦39,527₦52,759
Enugu₦40,763₦54,409
Benin City₦41,605₦55,532
Uyo₦42,867₦57,217
Jos₦40,317₦53,813
Riverine / creek site₦58,122₦77,578

Related marine & dredging rates

Frequently asked questions

How much does bathymetric survey with survey boat cost per km in Nigeria?

About ₦42,074 per km net in Abuja as at 15 October 2026, or about ₦56,158 per km as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦44,255 per km and the tender rate about ₦59,070 per km.

What does the rate include?

Materials (no materials) with waste allowances; labour (Chainman / survey assistant, Land surveyor) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Hydrographic survey boat with echo sounder & GNSS) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/k15-bathymetric-survey-with-survey-boat/, prices as at 15 October 2026.