Spread and compact reclaimed sand in layers: cost per m³ in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦1,154per m³

Tender rate about ₦1,540 per m³ with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for spread and compact reclaimed sand in layers is ₦1,154 per m³ in Abuja: ₦0 materials, ₦11.46 labour and ₦1,142 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦1,540 per m³.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Bulldozer D7 class0.000667 day-₦1,044,460₦697
Plant (days)Vibratory roller 16-20t0.000556 day-₦639,020₦355
Plant (days)Water tanker 10,000L0.00025 day-₦361,330₦90.33
Labour (hours)Unskilled labourer0.01 h-₦1,146₦11.46
Materials₦0
Labour₦11.46
Plant₦1,142
Net unit rate per m³₦1,154

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m³Tender rate incl. OH&P and VAT
Abuja (FCT)₦1,154₦1,540
Lagos₦1,212₦1,617
Port Harcourt₦1,245₦1,661
Ibadan₦1,094₦1,461
Osogbo (Osun)₦1,117₦1,490
Kano₦1,094₦1,460
Kaduna₦1,094₦1,460
Enugu₦1,129₦1,506
Benin City₦1,152₦1,537
Uyo₦1,186₦1,583
Jos₦1,117₦1,491
Riverine / creek site₦1,612₦2,151

Related marine & dredging rates

Frequently asked questions

How much does spread and compact reclaimed sand in layers cost per m³ in Nigeria?

About ₦1,154 per m³ net in Abuja as at 15 October 2026, or about ₦1,540 per m³ as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦1,212 per m³ and the tender rate about ₦1,617 per m³.

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Bulldozer D7 class, Vibratory roller 16-20t, Water tanker 10,000L) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/k04-spread-and-compact-reclaimed-sand-in-layers/, prices as at 15 October 2026.