Steel handrail/balustrade 1m high, 2" pipe & 25mm SHS, painted: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦35,583per m

Tender rate about ₦47,495 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for steel handrail/balustrade 1m high, 2" pipe & 25mm SHS, painted is ₦35,583 per m in Abuja: ₦26,250 materials, ₦9,334 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦47,495 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialBlack steel pipe 2" (60.3x2.9), 6m (4.11 kg/m)0.4 length5%₦39,333₦16,520
MaterialSquare hollow section 25x25x1.5, 6m (1.06 kg/m)0.6 length5%₦10,144₦6,391
MaterialWelding electrodes E6013 2.5mm, per kg0.3 kg5%₦2,800₦882
MaterialGloss paint (oil), 4L0.06 tin5%₦28,000₦1,764
MaterialRed oxide anti-rust primer, 4L0.03 tin5%₦22,000₦693
Labour (hours)Welder / fabricator2.5 h-₦2,948₦7,369
Labour (hours)Painter0.4 h-₦2,047₦819
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦26,250
Labour₦9,334
Plant₦0
Net unit rate per m₦35,583

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦35,583₦47,495
Lagos₦37,905₦50,594
Port Harcourt₦37,217₦49,675
Ibadan₦32,404₦43,251
Osogbo (Osun)₦32,200₦42,979
Kano₦31,412₦41,928
Kaduna₦31,955₦42,652
Enugu₦33,192₦44,302
Benin City₦33,641₦44,902
Uyo₦34,971₦46,677
Jos₦32,217₦43,002
Riverine / creek site₦44,392₦59,252

Related steelwork rates

Frequently asked questions

How much does steel handrail/balustrade 1m high, 2" pipe & 25mm SHS, painted cost per m in Nigeria?

About ₦35,583 per m net in Abuja as at 15 October 2026, or about ₦47,495 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦37,905 per m and the tender rate about ₦50,594 per m.

What does the rate include?

Materials (Black steel pipe 2" (60.3x2.9), Gloss paint (oil), Red oxide anti-rust primer, Square hollow section 25x25x1.5, Welding electrodes E6013 2.5mm) with waste allowances; labour (Painter, Unskilled labourer, Welder / fabricator) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.