Non-woven geotextile 400g/m2 laid as separator/filter: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦2,696per m²

Tender rate about ₦3,599 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for non-woven geotextile 400g/m2 laid as separator/filter is ₦2,696 per m² in Abuja: ₦2,662 materials, ₦34.39 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦3,599 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialNon-woven needle-punched geotextile 400g/m2, per m21.1 m²10%₦2,200₦2,662
Labour (hours)Unskilled labourer0.03 h-₦1,146₦34.39
Materials₦2,662
Labour₦34.39
Plant₦0
Net unit rate per m²₦2,696

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦2,696₦3,599
Lagos₦2,859₦3,816
Port Harcourt₦2,908₦3,881
Ibadan₦2,556₦3,412
Osogbo (Osun)₦2,581₦3,445
Kano₦2,501₦3,339
Kaduna₦2,529₦3,376
Enugu₦2,636₦3,519
Benin City₦2,664₦3,555
Uyo₦2,771₦3,699
Jos₦2,556₦3,411
Riverine / creek site₦3,498₦4,670

Related piling & ground engineering rates

Frequently asked questions

How much does non-woven geotextile 400g/m2 laid as separator/filter cost per m² in Nigeria?

About ₦2,696 per m² net in Abuja as at 15 October 2026, or about ₦3,599 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦2,859 per m² and the tender rate about ₦3,816 per m².

What does the rate include?

Materials (Non-woven needle-punched geotextile 400g/m2) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/p19-non-woven-geotextile-400g-m2-laid-as-separator-filter/, prices as at 15 October 2026.