Prices as at 15 October 2026, checked weekly. Base location Abuja.

Reno mattress 0.3m filled with stone: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦20,033per m²

Tender rate about ₦26,739 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for reno mattress 0.3m filled with stone is ₦20,033 per m² in Abuja: ₦17,331 materials, ₦2,702 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦26,739 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialReno mattress 0.3m thick, per m21.02 m²3%₦10,000₦10,506
MaterialBoulders / rip-rap, per tonne0.5 tonne5%₦13,000₦6,825
Labour (hours)Unskilled labourer1.5 h-₦1,146₦1,719
Labour (hours)Mason / bricklayer0.4 h-₦2,456₦982
Materials₦17,331
Labour₦2,702
Plant₦0
Net unit rate per m²₦20,033

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦20,033₦26,739
Lagos₦21,289₦28,415
Port Harcourt₦21,284₦28,409
Ibadan₦18,626₦24,861
Osogbo (Osun)₦18,664₦24,912
Kano₦18,144₦24,218
Kaduna₦18,399₦24,557
Enugu₦19,146₦25,555
Benin City₦19,373₦25,858
Uyo₦20,148₦26,892
Jos₦18,572₦24,789
Riverine / creek site₦25,502₦34,039

Related piling & ground engineering rates

Frequently asked questions

How much does reno mattress 0.3m filled with stone cost per m² in Nigeria?

About ₦20,033 per m² net in Abuja as at 15 October 2026, or about ₦26,739 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦21,289 per m² and the tender rate about ₦28,415 per m².

What does the rate include?

Materials (Boulders / rip-rap, Reno mattress 0.3m thick) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.