BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Gabion box 2x1x1m filled with hand-packed stone: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦103,028per unit

Tender rate about ₦137,516 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for gabion box 2x1x1m filled with hand-packed stone is ₦103,028 per unit in Abuja: ₦79,988 materials, ₦9,416 labour and ₦13,625 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦137,516 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialGabion box 2x1x1m, galvanised + PVC-coated mesh1 unit2%₦55,000₦56,100
MaterialBoulders / rip-rap, per tonne1.75 tonne5%₦13,000₦23,888
Plant (days)Hydraulic excavator 14t0.025 day-₦545,000₦13,625
Labour (hours)Unskilled labourer5 h-₦1,146₦5,731
Labour (hours)Mason / bricklayer1.5 h-₦2,456₦3,684
Materials₦79,988
Labour₦9,416
Plant₦13,625
Net unit rate per unit₦103,028

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦103,028₦137,516
Lagos₦109,262₦145,837
Port Harcourt₦110,046₦146,884
Ibadan₦96,464₦128,756
Osogbo (Osun)₦97,066₦129,558
Kano₦94,394₦125,992
Kaduna₦95,476₦127,437
Enugu₦99,273₦132,504
Benin City₦100,533₦134,187
Uyo₦104,424₦139,380
Jos₦96,549₦128,868
Riverine / creek site₦133,416₦178,077

Related piling & ground engineering rates

Frequently asked questions

How much does gabion box 2x1x1m filled with hand-packed stone cost per unit in Nigeria?

About ₦103,028 per unit net in Abuja as at 15 October 2026, or about ₦137,516 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦109,262 per unit and the tender rate about ₦145,837 per unit.

What does the rate include?

Materials (Boulders / rip-rap, Gabion box 2x1x1m) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Hydraulic excavator 14t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.