Bored cast-in-place pile 600mm dia in C30/37 concrete incl. rebar cage and drilling fluid: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦236,611per m

Tender rate about ₦315,816 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for bored cast-in-place pile 600mm dia in C30/37 concrete incl. rebar cage and drilling fluid is ₦236,611 per m in Abuja: ₦103,096 materials, ₦8,024 labour and ₦125,491 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦315,816 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialReady-mix C30/37, delivered Abuja (ex-pump)0.311 m³2%₦178,000₦56,465
MaterialHigh-yield rebar 12-16mm, per tonne0.035 tonne5%₦1,050,000₦38,588
MaterialBinding wire, per kg0.4 kg5%₦1,900₦798
MaterialBentonite (API grade), per tonne0.015 tonne5%₦460,000₦7,245
Plant (days)Bored piling rig (600-900mm)0.02857 day-₦3,449,850₦98,566
Plant (days)Mobile crane 25t0.02857 day-₦749,240₦21,407
Plant (days)Hydraulic excavator 20-22t (CAT 320/215 class)0.006667 day-₦827,850₦5,519
Labour (hours)Piling hand2 h-₦1,965₦3,930
Labour (hours)Iron bender / steel fixer1.2 h-₦2,456₦2,948
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦103,096
Labour₦8,024
Plant₦125,491
Net unit rate per m₦236,611

Scope note: Rig mobilisation, testing and pile-head cut-off measured separately.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦236,611₦315,816
Lagos₦249,713₦333,304
Port Harcourt₦254,497₦339,689
Ibadan₦223,577₦298,418
Osogbo (Osun)₦226,716₦302,609
Kano₦221,114₦295,131
Kaduna₦222,385₦296,828
Enugu₦230,434₦307,572
Benin City₦234,136₦312,512
Uyo₦242,265₦323,362
Jos₦225,926₦301,554
Riverine / creek site₦318,539₦425,168

Related piling & ground engineering rates

Frequently asked questions

How much does bored cast-in-place pile 600mm dia in C30/37 concrete incl. rebar cage and drilling fluid cost per m in Nigeria?

About ₦236,611 per m net in Abuja as at 15 October 2026, or about ₦315,816 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦249,713 per m and the tender rate about ₦333,304 per m.

What does the rate include?

Materials (Bentonite (API grade), Binding wire, High-yield rebar 12-16mm, Ready-mix C30/37) with waste allowances; labour (Iron bender / steel fixer, Piling hand, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Bored piling rig (600-900mm), Hydraulic excavator 20-22t (CAT 320/215 class), Mobile crane 25t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Rig mobilisation, testing and pile-head cut-off measured separately.