Aluminium louvre system installed: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦78,406per m²

Tender rate about ₦104,652 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for aluminium louvre system installed is ₦78,406 per m² in Abuja: ₦75,000 materials, ₦3,406 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦104,652 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialAluminium louvre system, per m21 m²-₦75,000₦75,000
Labour (hours)Aluminium fabricator / glazier1 h-₦2,948₦2,948
Labour (hours)Unskilled labourer0.4 h-₦1,146₦458
Materials₦75,000
Labour₦3,406
Plant₦0
Net unit rate per m²₦78,406

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦78,406₦104,652
Lagos₦83,178₦111,022
Port Harcourt₦84,236₦112,433
Ibadan₦73,975₦98,738
Osogbo (Osun)₦74,554₦99,511
Kano₦72,304₦96,508
Kaduna₦73,157₦97,646
Enugu₦76,225₦101,741
Benin City₦77,043₦102,833
Uyo₦80,145₦106,973
Jos₦73,907₦98,647
Riverine / creek site₦101,247₦135,139

Related finishes rates

Frequently asked questions

How much does aluminium louvre system installed cost per m² in Nigeria?

About ₦78,406 per m² net in Abuja as at 15 October 2026, or about ₦104,652 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦83,178 per m² and the tender rate about ₦111,022 per m².

What does the rate include?

Materials (Aluminium louvre system) with waste allowances; labour (Aluminium fabricator / glazier, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.