Break up 150mm concrete slab with excavator breaker, load debris: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦16,942per m²

Tender rate about ₦22,613 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for break up 150mm concrete slab with excavator breaker, load debris is ₦16,942 per m² in Abuja: ₦0 materials, ₦458 labour and ₦16,483 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦22,613 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Excavator 20t with hydraulic breaker0.01667 day-₦988,990₦16,483
Labour (hours)Unskilled labourer0.4 h-₦1,146₦458
Materials₦0
Labour₦458
Plant₦16,483
Net unit rate per m²₦16,942

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦16,942₦22,613
Lagos₦17,803₦23,762
Port Harcourt₦18,238₦24,343
Ibadan₦16,026₦21,391
Osogbo (Osun)₦16,333₦21,800
Kano₦16,003₦21,360
Kaduna₦16,017₦21,379
Enugu₦16,521₦22,051
Benin City₦16,859₦22,503
Uyo₦17,368₦23,182
Jos₦16,347₦21,819
Riverine / creek site₦23,581₦31,475

Related demolition rates

Frequently asked questions

How much does break up 150mm concrete slab with excavator breaker, load debris cost per m² in Nigeria?

About ₦16,942 per m² net in Abuja as at 15 October 2026, or about ₦22,613 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦17,803 per m² and the tender rate about ₦23,762 per m².

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Excavator 20t with hydraulic breaker) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/h02-break-up-150mm-concrete-slab-with-excavator-breaker-load/, prices as at 15 October 2026.