Demolish 225mm blockwork wall, stack debris on site: cost per m² in Nigeria
Net unit rate in Abuja, excluding overheads, profit and VAT
₦1,376per m²
Tender rate about ₦1,836 per m² with overheads, contingency, profit and VAT.
Price a BoQ with this rateAs at 15 October 2026, the net unit rate for demolish 225mm blockwork wall, stack debris on site is ₦1,376 per m² in Abuja: ₦0 materials, ₦1,376 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦1,836 per m².
Rate build-up (Abuja, Oct 2026)
| Resource type | Resource | Quantity per unit | Waste | Rate | Cost |
|---|---|---|---|---|---|
| Labour (hours) | Unskilled labourer | 1.2 h | - | ₦1,146 | ₦1,376 |
| Materials | ₦0 | ||||
| Labour | ₦1,376 | ||||
| Plant | ₦0 | ||||
| Net unit rate per m² | ₦1,376 |
Rate by location
Materials, labour and plant are adjusted separately with Buildocrat's location factors.
| Location | Net rate per m² | Tender rate incl. OH&P and VAT |
|---|---|---|
| Abuja (FCT) | ₦1,376 | ₦1,836 |
| Lagos | ₦1,486 | ₦1,983 |
| Port Harcourt | ₦1,307 | ₦1,744 |
| Ibadan | ₦1,100 | ₦1,469 |
| Osogbo (Osun) | ₦1,032 | ₦1,377 |
| Kano | ₦1,032 | ₦1,377 |
| Kaduna | ₦1,073 | ₦1,432 |
| Enugu | ₦1,100 | ₦1,469 |
| Benin City | ₦1,128 | ₦1,505 |
| Uyo | ₦1,169 | ₦1,561 |
| Jos | ₦1,073 | ₦1,432 |
| Riverine / creek site | ₦1,513 | ₦2,020 |
Related demolition rates
- H02 Break up 150mm concrete slab with excavator breaker, load debris₦16,942 per m²
- H03 Break out reinforced concrete with compressor & breakers₦83,358 per m³
Frequently asked questions
How much does demolish 225mm blockwork wall, stack debris on site cost per m² in Nigeria?
About ₦1,376 per m² net in Abuja as at 15 October 2026, or about ₦1,836 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).
What is the rate in Lagos?
Applying Buildocrat's Lagos location factors, the net rate is about ₦1,486 per m² and the tender rate about ₦1,983 per m².
What does the rate include?
Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.
How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/h01-demolish-225mm-blockwork-wall-stack-debris-on-site/, prices as at 15 October 2026.