BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

WC suite (economy), supplied, fixed & connected: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦92,805per unit

Tender rate about ₦123,871 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for wC suite (economy), supplied, fixed & connected is ₦92,805 per unit in Abuja: ₦82,980 materials, ₦9,825 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦123,871 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialWC suite, economy1 unit-₦75,000₦75,000
MaterialPPR pipe 20mm, 4m0.5 length5%₦3,800₦1,995
MaterialuPVC soil pipe 110mm, 5.8m0.3 length5%₦19,000₦5,985
Labour (hours)Plumber3 h-₦2,784₦8,351
Labour (hours)Plumber's mate1 h-₦1,474₦1,474
Materials₦82,980
Labour₦9,825
Plant₦0
Net unit rate per unit₦92,805

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦92,805₦123,871
Lagos₦98,570₦131,566
Port Harcourt₦98,952₦132,076
Ibadan₦86,691₦115,711
Osogbo (Osun)₦87,030₦116,162
Kano₦84,540₦112,840
Kaduna₦85,665₦114,341
Enugu₦89,180₦119,033
Benin City₦90,207₦120,403
Uyo₦93,821₦125,227
Jos₦86,494₦115,448
Riverine / creek site₦118,682₦158,410

Related plumbing rates

Frequently asked questions

How much does wC suite (economy), supplied, fixed & connected cost per unit in Nigeria?

About ₦92,805 per unit net in Abuja as at 15 October 2026, or about ₦123,871 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦98,570 per unit and the tender rate about ₦131,566 per unit.

What does the rate include?

Materials (PPR pipe 20mm, WC suite, uPVC soil pipe 110mm) with waste allowances; labour (Plumber, Plumber's mate) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/f06-wc-suite-economy-supplied-fixed-and-connected/, prices as at 15 October 2026.