Wash hand basin with pedestal & mixer, fixed & connected: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦101,674per unit

Tender rate about ₦135,709 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for wash hand basin with pedestal & mixer, fixed & connected is ₦101,674 per unit in Abuja: ₦93,978 materials, ₦7,696 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦135,709 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialWash hand basin with pedestal & mixer1 unit-₦85,000₦85,000
MaterialPPR pipe 20mm, 4m1 length5%₦3,800₦3,990
MaterialuPVC soil pipe 110mm, 5.8m0.25 length5%₦19,000₦4,988
Labour (hours)Plumber2.5 h-₦2,784₦6,959
Labour (hours)Plumber's mate0.5 h-₦1,474₦737
Materials₦93,978
Labour₦7,696
Plant₦0
Net unit rate per unit₦101,674

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦101,674₦135,709
Lagos₦107,928₦144,057
Port Harcourt₦108,807₦145,230
Ibadan₦95,436₦127,382
Osogbo (Osun)₦95,991₦128,123
Kano₦93,171₦124,360
Kaduna₦94,342₦125,923
Enugu₦98,255₦131,145
Benin City₦99,349₦132,605
Uyo₦103,339₦137,931
Jos₦95,282₦127,177
Riverine / creek site₦130,637₦174,367

Related plumbing rates

Frequently asked questions

How much does wash hand basin with pedestal & mixer, fixed & connected cost per unit in Nigeria?

About ₦101,674 per unit net in Abuja as at 15 October 2026, or about ₦135,709 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦107,928 per unit and the tender rate about ₦144,057 per unit.

What does the rate include?

Materials (PPR pipe 20mm, Wash hand basin with pedestal & mixer, uPVC soil pipe 110mm) with waste allowances; labour (Plumber, Plumber's mate) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/f04-wash-hand-basin-with-pedestal-and-mixer-fixed-and-connec/, prices as at 15 October 2026.