Turnout 1:12 UIC60 installed incl. ballast and tamping: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦250,358,680per unit

Tender rate about ₦334,165,466 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for turnout 1:12 UIC60 installed incl. ballast and tamping is ₦250,358,680 per unit in Abuja: ₦244,223,000 materials, ₦281,650 labour and ₦5,854,030 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦334,165,466 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialTurnout 1:12 UIC60 complete set1 set-₦242,606,000₦242,606,000
MaterialTrack ballast 25-50mm crushed granite, delivered, per tonne70 tonne5%₦22,000₦1,617,000
Plant (days)Mobile crane 25t2 day-₦749,240₦1,498,480
Plant (days)Ballast tamping machine1 day-₦4,355,550₦4,355,550
Labour (hours)Rail track worker120 h-₦1,965₦235,800
Labour (hours)Rail welder (thermite)8 h-₦5,731₦45,850
Materials₦244,223,000
Labour₦281,650
Plant₦5,854,030
Net unit rate per unit₦250,358,680

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦250,358,680₦334,165,466
Lagos₦265,327,294₦354,144,776
Port Harcourt₦270,350,760₦360,849,832
Ibadan₦237,798,498₦317,400,803
Osogbo (Osun)₦240,343,727₦320,798,038
Kano₦232,899,956₦310,862,488
Kaduna₦235,350,636₦314,133,525
Enugu₦245,300,809₦327,414,489
Benin City₦247,865,753₦330,838,039
Uyo₦257,818,743₦344,122,762
Jos₦237,909,946₦317,549,557
Riverine / creek site₦325,995,357₦435,121,284

Related railways rates

Frequently asked questions

How much does turnout 1:12 UIC60 installed incl. ballast and tamping cost per unit in Nigeria?

About ₦250,358,680 per unit net in Abuja as at 15 October 2026, or about ₦334,165,466 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦265,327,294 per unit and the tender rate about ₦354,144,776 per unit.

What does the rate include?

Materials (Track ballast 25-50mm crushed granite, Turnout 1:12 UIC60 complete set) with waste allowances; labour (Rail track worker, Rail welder (thermite)) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Ballast tamping machine, Mobile crane 25t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/l03-turnout-1-12-uic60-installed-incl-ballast-and-tamping/, prices as at 15 October 2026.