Goods lift 1000kg 3 stops incl. builder's attendance: cost per unit in Nigeria
Net unit rate in Abuja, excluding overheads, profit and VAT
₦97,088,250per unit
Tender rate about ₦129,588,238 per unit with overheads, contingency, profit and VAT.
Price a BoQ with this rateAs at 15 October 2026, the net unit rate for goods lift 1000kg 3 stops incl. builder's attendance is ₦97,088,250 per unit in Abuja: ₦97,042,400 materials, ₦45,850 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦129,588,238 per unit.
Rate build-up (Abuja, Oct 2026)
| Resource type | Resource | Quantity per unit | Waste | Rate | Cost |
|---|---|---|---|---|---|
| Material | Goods lift 1000kg 3 stops, supply & install | 1 unit | - | ₦97,042,400 | ₦97,042,400 |
| Labour (hours) | Unskilled labourer | 40 h | - | ₦1,146 | ₦45,850 |
| Materials | ₦97,042,400 | ||||
| Labour | ₦45,850 | ||||
| Plant | ₦0 | ||||
| Net unit rate per unit | ₦97,088,250 |
Rate by location
Materials, labour and plant are adjusted separately with Buildocrat's location factors.
| Location | Net rate per unit | Tender rate incl. OH&P and VAT |
|---|---|---|
| Abuja (FCT) | ₦97,088,250 | ₦129,588,238 |
| Lagos | ₦102,914,462 | ₦137,364,757 |
| Port Harcourt | ₦104,849,350 | ₦139,947,342 |
| Ibadan | ₦92,226,960 | ₦123,099,647 |
| Osogbo (Osun) | ₦93,195,092 | ₦124,391,857 |
| Kano | ₦90,283,820 | ₦120,506,046 |
| Kaduna | ₦91,255,619 | ₦121,803,152 |
| Enugu | ₦95,138,232 | ₦126,985,458 |
| Benin City | ₦96,109,573 | ₦128,281,952 |
| Uyo | ₦99,992,644 | ₦133,464,870 |
| Jos | ₦92,226,043 | ₦123,098,423 |
| Riverine / creek site | ₦126,205,555 | ₦168,452,470 |
Related fire, hvac, lifts & ict rates
- X01 Addressable smoke detection point with 15m FP cable in conduit₦123,606 per point
- X02 Addressable fire alarm panel 2-loop installed and commissioned₦6,597,200 per unit
- X03 Manual call point with 15m FP cable in conduit₦112,310 per unit
- X04 Sounder-beacon with 15m FP cable in conduit₦121,642 per unit
- X05 Sprinkler head with 3m 1" galvanised branch pipe and hangers₦33,270 per unit
- X06 Fire hose reel cabinet installed with 12m 1" supply₦520,667 per unit
- X07 Dry powder extinguisher 9kg wall-mounted with sign₦54,344 per unit
- X08 Fire pump set 500gpm installed on base and commissioned₦72,104,521 per set
- X09 VRF air-conditioning per HP installed (outdoor, cassette share, piping, refrigerant)₦2,164,900 per HP
- X10 Ceiling cassette split AC 3HP installed with 6m piping₦1,920,589 per unit
- X11 Galvanised ductwork with insulation installed₦35,492 per m²
- X12 Ceiling diffuser installed and balanced₦48,275 per unit
- X13 Passenger lift 8-person 5 stops incl. builder's attendance₦85,940,490 per unit
- X14 Escalator 4.5m rise incl. builder's attendance and lifting₦178,680,435 per unit
- X15 Cat6 data point (avg 30m) with outlet and patch panel share₦30,770 per point
- X16 IP CCTV camera installed with 25m Cat6 and NVR share₦113,384 per unit
- X17 Access-controlled door (reader, maglock, exit button)₦382,170 per unit
- X18 Solar water heater 200L installed and connected₦894,180 per unit
Frequently asked questions
How much does goods lift 1000kg 3 stops incl. builder's attendance cost per unit in Nigeria?
About ₦97,088,250 per unit net in Abuja as at 15 October 2026, or about ₦129,588,238 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).
What is the rate in Lagos?
Applying Buildocrat's Lagos location factors, the net rate is about ₦102,914,462 per unit and the tender rate about ₦137,364,757 per unit.
What does the rate include?
Materials (Goods lift 1000kg 3 stops) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.
How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/x20-goods-lift-1000kg-3-stops-incl-builder-s-attendance/, prices as at 15 October 2026.