Passenger lift 8-person 5 stops incl. builder's attendance: cost per unit in Nigeria
Net unit rate in Abuja, excluding overheads, profit and VAT
₦85,940,490per unit
Tender rate about ₦114,708,800 per unit with overheads, contingency, profit and VAT.
Price a BoQ with this rateAs at 15 October 2026, the net unit rate for passenger lift 8-person 5 stops incl. builder's attendance is ₦85,940,490 per unit in Abuja: ₦85,894,640 materials, ₦45,850 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦114,708,800 per unit.
Rate build-up (Abuja, Oct 2026)
| Resource type | Resource | Quantity per unit | Waste | Rate | Cost |
|---|---|---|---|---|---|
| Material | Passenger lift 8-person (630kg) 5 stops, machine-room-less, supply & install | 1 unit | - | ₦85,845,200 | ₦85,845,200 |
| Material | OPC 42.5 cement, 50kg bag - adopted market average | 4 bag | 3% | ₦12,000 | ₦49,440 |
| Labour (hours) | Unskilled labourer | 40 h | - | ₦1,146 | ₦45,850 |
| Materials | ₦85,894,640 | ||||
| Labour | ₦45,850 | ||||
| Plant | ₦0 | ||||
| Net unit rate per unit | ₦85,940,490 |
Rate by location
Materials, labour and plant are adjusted separately with Buildocrat's location factors.
| Location | Net rate per unit | Tender rate incl. OH&P and VAT |
|---|---|---|
| Abuja (FCT) | ₦85,940,490 | ₦114,708,800 |
| Lagos | ₦91,097,836 | ₦121,592,552 |
| Port Harcourt | ₦92,809,769 | ₦123,877,549 |
| Ibadan | ₦81,636,588 | ₦108,964,181 |
| Osogbo (Osun) | ₦82,493,242 | ₦110,107,597 |
| Kano | ₦79,916,403 | ₦106,668,169 |
| Kaduna | ₦80,776,725 | ₦107,816,481 |
| Enugu | ₦84,213,427 | ₦112,403,609 |
| Benin City | ₦85,073,291 | ₦113,551,309 |
| Uyo | ₦88,510,452 | ₦118,139,049 |
| Jos | ₦81,635,671 | ₦108,962,957 |
| Riverine / creek site | ₦111,713,467 | ₦149,109,201 |
Related fire, hvac, lifts & ict rates
- X01 Addressable smoke detection point with 15m FP cable in conduit₦123,606 per point
- X02 Addressable fire alarm panel 2-loop installed and commissioned₦6,597,200 per unit
- X03 Manual call point with 15m FP cable in conduit₦112,310 per unit
- X04 Sounder-beacon with 15m FP cable in conduit₦121,642 per unit
- X05 Sprinkler head with 3m 1" galvanised branch pipe and hangers₦33,270 per unit
- X06 Fire hose reel cabinet installed with 12m 1" supply₦520,667 per unit
- X07 Dry powder extinguisher 9kg wall-mounted with sign₦54,344 per unit
- X08 Fire pump set 500gpm installed on base and commissioned₦72,104,521 per set
- X09 VRF air-conditioning per HP installed (outdoor, cassette share, piping, refrigerant)₦2,164,900 per HP
- X10 Ceiling cassette split AC 3HP installed with 6m piping₦1,920,589 per unit
- X11 Galvanised ductwork with insulation installed₦35,492 per m²
- X12 Ceiling diffuser installed and balanced₦48,275 per unit
- X14 Escalator 4.5m rise incl. builder's attendance and lifting₦178,680,435 per unit
- X15 Cat6 data point (avg 30m) with outlet and patch panel share₦30,770 per point
- X16 IP CCTV camera installed with 25m Cat6 and NVR share₦113,384 per unit
- X17 Access-controlled door (reader, maglock, exit button)₦382,170 per unit
- X18 Solar water heater 200L installed and connected₦894,180 per unit
- X19 Air-cooled chiller per TR installed₦1,423,861 per TR
Frequently asked questions
How much does passenger lift 8-person 5 stops incl. builder's attendance cost per unit in Nigeria?
About ₦85,940,490 per unit net in Abuja as at 15 October 2026, or about ₦114,708,800 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).
What is the rate in Lagos?
Applying Buildocrat's Lagos location factors, the net rate is about ₦91,097,836 per unit and the tender rate about ₦121,592,552 per unit.
What does the rate include?
Materials (OPC 42.5 cement, Passenger lift 8-person (630kg) 5 stops) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.
How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/x13-passenger-lift-8-person-5-stops-incl-builder-s-attendanc/, prices as at 15 October 2026.