Precast concrete safety barrier installed: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦105,047per m

Tender rate about ₦140,212 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for precast concrete safety barrier installed is ₦105,047 per m in Abuja: ₦96,900 materials, ₦458 labour and ₦7,689 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦140,212 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialPrecast concrete safety barrier (New Jersey), per m1 m2%₦95,000₦96,900
Plant (days)Hiab / truck-mounted crane 10t0.01667 day-₦461,330₦7,689
Labour (hours)Unskilled labourer0.4 h-₦1,146₦458
Materials₦96,900
Labour₦458
Plant₦7,689
Net unit rate per m₦105,047

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦105,047₦140,212
Lagos₦111,283₦148,534
Port Harcourt₦113,392₦151,349
Ibadan₦99,726₦133,109
Osogbo (Osun)₦100,826₦134,577
Kano₦97,765₦130,492
Kaduna₦98,748₦131,804
Enugu₦102,864₦137,297
Benin City₦103,996₦138,808
Uyo₦108,116₦144,308
Jos₦99,871₦133,302
Riverine / creek site₦137,239₦183,179

Related roads & external rates

Frequently asked questions

How much does precast concrete safety barrier installed cost per m in Nigeria?

About ₦105,047 per m net in Abuja as at 15 October 2026, or about ₦140,212 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦111,283 per m and the tender rate about ₦148,534 per m.

What does the rate include?

Materials (Precast concrete safety barrier (New Jersey)) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Hiab / truck-mounted crane 10t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.