Carpet grass laid on 100mm topsoil, watered: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦2,790per m²

Tender rate about ₦3,725 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for carpet grass laid on 100mm topsoil, watered is ₦2,790 per m² in Abuja: ₦2,422 materials, ₦368 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦3,725 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialCarpet grass, per m21 m²5%₦1,500₦1,575
MaterialTopsoil, per tonne0.16 tonne5%₦4,000₦672
MaterialWater, per m30.05 m³-₦3,500₦175
Labour (hours)Landscaper / gardener0.25 h-₦1,474₦368
Materials₦2,422
Labour₦368
Plant₦0
Net unit rate per m²₦2,790

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦2,790₦3,725
Lagos₦2,965₦3,958
Port Harcourt₦2,966₦3,959
Ibadan₦2,596₦3,465
Osogbo (Osun)₦2,601₦3,472
Kano₦2,529₦3,375
Kaduna₦2,564₦3,422
Enugu₦2,668₦3,562
Benin City₦2,700₦3,604
Uyo₦2,808₦3,748
Jos₦2,588₦3,455
Riverine / creek site₦3,554₦4,744

Related roads & external rates

Frequently asked questions

How much does carpet grass laid on 100mm topsoil, watered cost per m² in Nigeria?

About ₦2,790 per m² net in Abuja as at 15 October 2026, or about ₦3,725 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦2,965 per m² and the tender rate about ₦3,958 per m².

What does the rate include?

Materials (Carpet grass, Topsoil, Water) with waste allowances; labour (Landscaper / gardener) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/r16-carpet-grass-laid-on-100mm-topsoil-watered/, prices as at 15 October 2026.