Prime coat MC-30 at 1.0 L/m2: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦1,653per m²

Tender rate about ₦2,207 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for prime coat MC-30 at 1.0 L/m2 is ₦1,653 per m² in Abuja: ₦1,522 materials, ₦11.46 labour and ₦119 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦2,207 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialMC-30 cutback, per litre1 litre5%₦1,450₦1,522
Plant (days)Bitumen distributor / sprayer0.000167 day-₦540,760₦90.31
Plant (days)Mechanical road broom0.000167 day-₦174,460₦29.13
Labour (hours)Unskilled labourer0.01 h-₦1,146₦11.46
Materials₦1,522
Labour₦11.46
Plant₦119
Net unit rate per m²₦1,653

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦1,653₦2,207
Lagos₦1,752₦2,338
Port Harcourt₦1,784₦2,381
Ibadan₦1,569₦2,094
Osogbo (Osun)₦1,586₦2,117
Kano₦1,538₦2,053
Kaduna₦1,554₦2,074
Enugu₦1,618₦2,160
Benin City₦1,636₦2,184
Uyo₦1,701₦2,270
Jos₦1,571₦2,097
Riverine / creek site₦2,159₦2,882

Related roads & external rates

Frequently asked questions

How much does prime coat MC-30 at 1.0 L/m2 cost per m² in Nigeria?

About ₦1,653 per m² net in Abuja as at 15 October 2026, or about ₦2,207 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦1,752 per m² and the tender rate about ₦2,338 per m².

What does the rate include?

Materials (MC-30 cutback) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Bitumen distributor / sprayer, Mechanical road broom) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/r04-prime-coat-mc-30-at-1-0-l-m2/, prices as at 15 October 2026.