Scarify, water & compact subgrade to 95% MDD: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦577per m²

Tender rate about ₦770 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for scarify, water & compact subgrade to 95% MDD is ₦577 per m² in Abuja: ₦0 materials, ₦22.93 labour and ₦554 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦770 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Plant (days)Motor grader (CAT 140 class)0.000333 day-₦729,900₦243
Plant (days)Vibratory roller 10-12t0.0004 day-₦477,310₦191
Plant (days)Water tanker 10,000L0.000333 day-₦361,330₦120
Labour (hours)Unskilled labourer0.02 h-₦1,146₦22.93
Materials₦0
Labour₦22.93
Plant₦554
Net unit rate per m²₦577

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦577₦770
Lagos₦607₦810
Port Harcourt₦620₦828
Ibadan₦545₦727
Osogbo (Osun)₦555₦741
Kano₦544₦726
Kaduna₦544₦727
Enugu₦562₦750
Benin City₦573₦765
Uyo₦590₦788
Jos₦556₦742
Riverine / creek site₦801₦1,069

Related roads & external rates

Frequently asked questions

How much does scarify, water & compact subgrade to 95% MDD cost per m² in Nigeria?

About ₦577 per m² net in Abuja as at 15 October 2026, or about ₦770 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦607 per m² and the tender rate about ₦810 per m².

What does the rate include?

Materials (no materials) with waste allowances; labour (Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Motor grader (CAT 140 class), Vibratory roller 10-12t, Water tanker 10,000L) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/r01-scarify-water-and-compact-subgrade-to-95-mdd/, prices as at 15 October 2026.