Steel security door 1200, supply & fix with grouting: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦433,720per unit

Tender rate about ₦578,907 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for steel security door 1200, supply & fix with grouting is ₦433,720 per unit in Abuja: ₦424,059 materials, ₦9,661 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦578,907 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialSteel security door, imported, 1200 (supply)1 unit-₦420,000₦420,000
MaterialOPC 42.5 cement, 50kg bag - adopted market average0.3 bag3%₦12,000₦3,708
MaterialSharp sand, per tonne0.05 tonne8%₦6,500₦351
Labour (hours)Mason / bricklayer3 h-₦2,456₦7,369
Labour (hours)Unskilled labourer2 h-₦1,146₦2,292
Materials₦424,059
Labour₦9,661
Plant₦0
Net unit rate per unit₦433,720

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦433,720₦578,907
Lagos₦459,937₦613,899
Port Harcourt₦467,162₦623,543
Ibadan₦410,585₦548,027
Osogbo (Osun)₦414,343₦553,042
Kano₦401,621₦536,062
Kaduna₦406,151₦542,109
Enugu₦423,307₦565,007
Benin City₦427,741₦570,925
Uyo₦444,993₦593,953
Jos₦410,392₦547,769
Riverine / creek site₦561,904₦750,000

Related doors & windows rates

Frequently asked questions

How much does steel security door 1200, supply & fix with grouting cost per unit in Nigeria?

About ₦433,720 per unit net in Abuja as at 15 October 2026, or about ₦578,907 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦459,937 per unit and the tender rate about ₦613,899 per unit.

What does the rate include?

Materials (OPC 42.5 cement, Sharp sand, Steel security door) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/j03-steel-security-door-1200-supply-and-fix-with-grouting/, prices as at 15 October 2026.