Aluminium casement window, 5mm glass & net, s&f incl. making good: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦95,984per m²

Tender rate about ₦128,114 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for aluminium casement window, 5mm glass & net, s&f incl. making good is ₦95,984 per m² in Abuja: ₦95,247 materials, ₦737 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦128,114 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialAluminium casement window, 5mm glass & net - supply & fix1 m²-₦95,000₦95,000
MaterialOPC 42.5 cement, 50kg bag - adopted market average0.02 bag3%₦12,000₦247
Labour (hours)Mason / bricklayer0.3 h-₦2,456₦737
Materials₦95,247
Labour₦737
Plant₦0
Net unit rate per m²₦95,984

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦95,984₦128,114
Lagos₦101,758₦135,821
Port Harcourt₦103,567₦138,236
Ibadan₦91,074₦121,561
Osogbo (Osun)₦91,990₦122,783
Kano₦89,133₦118,969
Kaduna₦90,107₦120,270
Enugu₦93,932₦125,375
Benin City₦94,899₦126,666
Uyo₦98,731₦131,781
Jos₦91,060₦121,542
Riverine / creek site₦124,632₦166,352

Related doors & windows rates

Frequently asked questions

How much does aluminium casement window, 5mm glass & net, s&f incl. making good cost per m² in Nigeria?

About ₦95,984 per m² net in Abuja as at 15 October 2026, or about ₦128,114 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦101,758 per m² and the tender rate about ₦135,821 per m².

What does the rate include?

Materials (Aluminium casement window, OPC 42.5 cement) with waste allowances; labour (Mason / bricklayer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/j04-aluminium-casement-window-5mm-glass-and-net-s-and-f-incl/, prices as at 15 October 2026.