Roller blind supplied and fixed: cost per m² in Nigeria
Net unit rate in Abuja, excluding overheads, profit and VAT
₦22,884per m²
Tender rate about ₦30,545 per m² with overheads, contingency, profit and VAT.
Price a BoQ with this rateAs at 15 October 2026, the net unit rate for roller blind supplied and fixed is ₦22,884 per m² in Abuja: ₦22,000 materials, ₦884 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦30,545 per m².
Rate build-up (Abuja, Oct 2026)
| Resource type | Resource | Quantity per unit | Waste | Rate | Cost |
|---|---|---|---|---|---|
| Material | Roller blind, per m2 | 1 m² | - | ₦22,000 | ₦22,000 |
| Labour (hours) | Joiner / cabinet maker | 0.3 h | - | ₦2,948 | ₦884 |
| Materials | ₦22,000 | ||||
| Labour | ₦884 | ||||
| Plant | ₦0 | ||||
| Net unit rate per m² | ₦22,884 |
Rate by location
Materials, labour and plant are adjusted separately with Buildocrat's location factors.
| Location | Net rate per m² | Tender rate incl. OH&P and VAT |
|---|---|---|
| Abuja (FCT) | ₦22,884 | ₦30,545 |
| Lagos | ₦24,275 | ₦32,401 |
| Port Harcourt | ₦24,600 | ₦32,835 |
| Ibadan | ₦21,607 | ₦28,840 |
| Osogbo (Osun) | ₦21,783 | ₦29,075 |
| Kano | ₦21,123 | ₦28,194 |
| Kaduna | ₦21,370 | ₦28,523 |
| Enugu | ₦22,267 | ₦29,721 |
| Benin City | ₦22,505 | ₦30,039 |
| Uyo | ₦23,412 | ₦31,249 |
| Jos | ₦21,590 | ₦28,817 |
| Riverine / creek site | ₦29,573 | ₦39,472 |
Related finishes rates
- E01 15mm internal plaster, cement-sand 1:6, to blockwork₦3,202 per m²
- E02 20mm external render, cement-sand 1:4₦4,708 per m²
- E03 40mm cement-sand 1:3 floor screed₦6,305 per m²
- E04 600x600 ceramic floor tiles (mid-range) on adhesive, grouted₦13,875 per m²
- E05 600x600 polished porcelain floor tiles (premium) on adhesive, grouted₦31,369 per m²
- E10 600x600 matt anti-slip porcelain floor tiles on adhesive₦19,907 per m²
- E11 400x400 ceramic floor tiles on adhesive₦10,595 per m²
- E06 300x600 wall tiles on adhesive, grouted₦13,736 per m²
- E15 100mm tile skirting on adhesive₦2,709 per m
- E12 20mm local polished granite flooring on mortar bed₦59,729 per m²
- E13 20mm imported marble flooring on mortar bed₦104,285 per m²
- E14 SPC vinyl click flooring on underlay₦8,837 per m²
- E26 8mm laminate flooring on underlay₦10,555 per m²
- E27 Carpet tiles on adhesive₦15,314 per m²
- E25 2-coat epoxy floor coating₦6,599 per m²
- E24 Natural stone wall cladding on adhesive₦27,280 per m²
- E07 Skim coat + 3 coats emulsion to internal plastered walls₦2,375 per m²
- E16 Sealer + skim + 3 coats silk emulsion to internal walls₦3,162 per m²
Frequently asked questions
How much does roller blind supplied and fixed cost per m² in Nigeria?
About ₦22,884 per m² net in Abuja as at 15 October 2026, or about ₦30,545 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).
What is the rate in Lagos?
Applying Buildocrat's Lagos location factors, the net rate is about ₦24,275 per m² and the tender rate about ₦32,401 per m².
What does the rate include?
Materials (Roller blind) with waste allowances; labour (Joiner / cabinet maker) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.
How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/e32-roller-blind-supplied-and-fixed/, prices as at 15 October 2026.