16mm2 4-core armoured sub-main cable laid in trench/on tray: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦24,027per m

Tender rate about ₦32,070 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for 16mm2 4-core armoured sub-main cable laid in trench/on tray is ₦24,027 per m in Abuja: ₦22,660 materials, ₦1,367 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦32,070 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
Material16mm2 4-core armoured Cu cable, per m1 m3%₦22,000₦22,660
Labour (hours)Electrician0.3 h-₦3,029₦909
Labour (hours)Unskilled labourer0.4 h-₦1,146₦458
Materials₦22,660
Labour₦1,367
Plant₦0
Net unit rate per m₦24,027

Scope note: Excl. trench.

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦24,027₦32,070
Lagos₦25,496₦34,031
Port Harcourt₦25,772₦34,399
Ibadan₦22,621₦30,193
Osogbo (Osun)₦22,779₦30,404
Kano₦22,099₦29,497
Kaduna₦22,367₦29,854
Enugu₦23,301₦31,100
Benin City₦23,555₦31,439
Uyo₦24,502₦32,704
Jos₦22,594₦30,157
Riverine / creek site₦30,962₦41,326

Related electrical rates

Frequently asked questions

How much does 16mm2 4-core armoured sub-main cable laid in trench/on tray cost per m in Nigeria?

About ₦24,027 per m net in Abuja as at 15 October 2026, or about ₦32,070 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦25,496 per m and the tender rate about ₦34,031 per m.

What does the rate include?

Materials (16mm2 4-core armoured Cu cable) with waste allowances; labour (Electrician, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate. Scope note: Excl. trench.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/f25-16mm2-4-core-armoured-sub-main-cable-laid-in-trench-on-t/, prices as at 15 October 2026.