BuildocratRate Book

Prices as at 15 October 2026, checked weekly. Base location Abuja.

Heavy-duty shoring tower, per tower per month incl. erect and dismantle: cost per unit in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦48,755per unit

Tender rate about ₦65,076 per unit with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for heavy-duty shoring tower, per tower per month incl. erect and dismantle is ₦48,755 per unit in Abuja: ₦35,000 materials, ₦13,755 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦65,076 per unit.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHeavy-duty shoring tower hire, per tower per month1 unit-₦35,000₦35,000
Labour (hours)Scaffolder4 h-₦2,292₦9,170
Labour (hours)Unskilled labourer4 h-₦1,146₦4,585
Materials₦35,000
Labour₦13,755
Plant₦0
Net unit rate per unit₦48,755

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per unitTender rate incl. OH&P and VAT
Abuja (FCT)₦48,755₦65,076
Lagos₦51,955₦69,347
Port Harcourt₦50,867₦67,895
Ibadan₦44,254₦59,068
Osogbo (Osun)₦43,916₦58,617
Kano₦42,866₦57,216
Kaduna₦43,629₦58,234
Enugu₦45,304₦60,469
Benin City₦45,929₦61,304
Uyo₦47,742₦63,723
Jos₦43,979₦58,701
Riverine / creek site₦60,630₦80,926

Related bridges & heavy structures rates

Frequently asked questions

How much does heavy-duty shoring tower, per tower per month incl. erect and dismantle cost per unit in Nigeria?

About ₦48,755 per unit net in Abuja as at 15 October 2026, or about ₦65,076 per unit as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦51,955 per unit and the tender rate about ₦69,347 per unit.

What does the rate include?

Materials (Heavy-duty shoring tower hire) with waste allowances; labour (Scaffolder, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/q12-heavy-duty-shoring-tower-per-tower-per-month-incl-erect/, prices as at 15 October 2026.