Half-brick burnt clay facing brickwork in mortar 1:4, pointed: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦34,949per m²

Tender rate about ₦46,649 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for half-brick burnt clay facing brickwork in mortar 1:4, pointed is ₦34,949 per m² in Abuja: ₦30,856 materials, ₦4,094 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦46,649 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialBurnt clay facing brick 215x102.5x6560 unit5%₦450₦28,350
MaterialOPC 42.5 cement, 50kg bag - adopted market average0.18 bag3%₦12,000₦2,225
MaterialSharp sand, per tonne0.04 tonne8%₦6,500₦281
Labour (hours)Mason / bricklayer1.2 h-₦2,456₦2,948
Labour (hours)Unskilled labourer1 h-₦1,146₦1,146
Materials₦30,856
Labour₦4,094
Plant₦0
Net unit rate per m²₦34,949

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦34,949₦46,649
Lagos₦37,128₦49,557
Port Harcourt₦37,213₦49,670
Ibadan₦32,588₦43,496
Osogbo (Osun)₦32,692₦43,635
Kano₦31,766₦42,400
Kaduna₦32,197₦42,975
Enugu₦33,513₦44,732
Benin City₦33,904₦45,253
Uyo₦35,261₦47,064
Jos₦32,506₦43,387
Riverine / creek site₦44,615₦59,550

Related masonry rates

Frequently asked questions

How much does half-brick burnt clay facing brickwork in mortar 1:4, pointed cost per m² in Nigeria?

About ₦34,949 per m² net in Abuja as at 15 October 2026, or about ₦46,649 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦37,128 per m² and the tender rate about ₦49,557 per m².

What does the rate include?

Materials (Burnt clay facing brick 215x102.5x65, OPC 42.5 cement, Sharp sand) with waste allowances; labour (Mason / bricklayer, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.