HPL exterior cladding on steel sub-frame: cost per m² in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦151,216per m²

Tender rate about ₦201,835 per m² with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hPL exterior cladding on steel sub-frame is ₦151,216 per m² in Abuja: ₦147,106 materials, ₦4,110 labour and ₦0 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦201,835 per m².

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHPL exterior cladding panel 8mm, per m21.08 m²8%₦121,303₦141,488
MaterialSquare hollow section 25x25x1.5, 6m (1.06 kg/m)0.35 length5%₦10,144₦3,728
MaterialExpansion anchor bolt M122 unit5%₦900₦1,890
Labour (hours)Aluminium fabricator / glazier1.2 h-₦2,948₦3,537
Labour (hours)Unskilled labourer0.5 h-₦1,146₦573
Materials₦147,106
Labour₦4,110
Plant₦0
Net unit rate per m²₦151,216

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per m²Tender rate incl. OH&P and VAT
Abuja (FCT)₦151,216₦201,835
Lagos₦160,371₦214,055
Port Harcourt₦162,779₦217,269
Ibadan₦143,039₦190,920
Osogbo (Osun)₦144,304₦192,610
Kano₦139,891₦186,719
Kaduna₦141,485₦188,847
Enugu₦147,452₦196,811
Benin City₦149,005₦198,884
Uyo₦155,013₦206,903
Jos₦142,956₦190,811
Riverine / creek site₦195,759₦261,288

Related finishes rates

Frequently asked questions

How much does hPL exterior cladding on steel sub-frame cost per m² in Nigeria?

About ₦151,216 per m² net in Abuja as at 15 October 2026, or about ₦201,835 per m² as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦160,371 per m² and the tender rate about ₦214,055 per m².

What does the rate include?

Materials (Expansion anchor bolt M12, HPL exterior cladding panel 8mm, Square hollow section 25x25x1.5) with waste allowances; labour (Aluminium fabricator / glazier, Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (no plant) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/e34-hpl-exterior-cladding-on-steel-sub-frame/, prices as at 15 October 2026.