HDPE twin-wall culvert 600mm laid on and surrounded with sand: cost per m in Nigeria

Net unit rate in Abuja, excluding overheads, profit and VAT

₦71,310per m

Tender rate about ₦95,181 per m with overheads, contingency, profit and VAT.

Price a BoQ with this rate

As at 15 October 2026, the net unit rate for hDPE twin-wall culvert 600mm laid on and surrounded with sand is ₦71,310 per m in Abuja: ₦59,590 materials, ₦2,636 labour and ₦9,084 plant. With overheads (7.5%), contingency (5%), profit (10%) and VAT (7.5%) the tender rate is about ₦95,181 per m.

Rate build-up (Abuja, Oct 2026)

Resource typeResourceQuantity per unitWasteRateCost
MaterialHDPE twin-wall corrugated culvert pipe 600mm, per m1 m3%₦55,000₦56,650
MaterialFilling sand, per tonne0.8 tonne5%₦3,500₦2,940
Plant (days)Hydraulic excavator 14t0.01667 day-₦545,000₦9,084
Labour (hours)Pipe layer (drainage)0.4 h-₦2,292₦917
Labour (hours)Unskilled labourer1.5 h-₦1,146₦1,719
Materials₦59,590
Labour₦2,636
Plant₦9,084
Net unit rate per m₦71,310

Rate by location

Materials, labour and plant are adjusted separately with Buildocrat's location factors.

LocationNet rate per mTender rate incl. OH&P and VAT
Abuja (FCT)₦71,310₦95,181
Lagos₦75,550₦100,841
Port Harcourt₦76,672₦102,338
Ibadan₦67,349₦89,894
Osogbo (Osun)₦67,995₦90,756
Kano₦66,025₦88,127
Kaduna₦66,700₦89,028
Enugu₦69,409₦92,644
Benin City₦70,239₦93,752
Uyo₦72,975₦97,403
Jos₦67,478₦90,066
Riverine / creek site₦93,084₦124,243

Related roads & external rates

Frequently asked questions

How much does hDPE twin-wall culvert 600mm laid on and surrounded with sand cost per m in Nigeria?

About ₦71,310 per m net in Abuja as at 15 October 2026, or about ₦95,181 per m as a tender rate including overheads, contingency, profit and VAT (Buildocrat Nigeria Construction Rate Book).

What is the rate in Lagos?

Applying Buildocrat's Lagos location factors, the net rate is about ₦75,550 per m and the tender rate about ₦100,841 per m.

What does the rate include?

Materials (Filling sand, HDPE twin-wall corrugated culvert pipe 600mm) with waste allowances; labour (Pipe layer (drainage), Unskilled labourer) at all-in rates including feeding, transport, idle time and statutory costs; and plant (Hydraulic excavator 14t) including fuel and operator. Overheads, profit and VAT are excluded from the net rate.

How to cite: Buildocrat, Nigeria Construction Rate Book, https://rates.buildocrat.store/rates/r21-hdpe-twin-wall-culvert-600mm-laid-on-and-surrounded-with/, prices as at 15 October 2026.